My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 12:17:26 PM
Creation date
1/31/2019 11:58:38 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />EXECUTION <br />01 73 00 - 4 <br /> <br /> <br />3.4 INSTALLATION <br />A. General: Locate the Work and components of the Work accurately, in correct <br />alignment and elevation, as indicated. <br />1. Make vertical work plumb and make horizontal work level. <br />2. Where space is limited, install components to maximize space available for <br />maintenance and ease of removal for replacement. <br />3. Conceal pipes, ducts, and wiring in finished areas unless otherwise indicated. <br />B. Comply with manufacturer's written instructions and recommendations for installing <br />products in applications indicated. <br />C. Install products at the time and under conditions that will ensure the best possible <br />results. Maintain conditions required for product performance until Substantial <br />Completion. <br />D. Conduct construction operations so no part of the Work is subjected to damaging <br />operations or loading in excess of that expected during normal conditions of <br />occupancy. <br />E. Sequence the Work and allow adequate clearances to accommodate movement of <br />construction items on site and placement in permanent locations. <br />F. Tools and Equipment: Where possible, select tools or equipment that minimize <br />production of excessive noise levels. <br />G. Templates: Obtain and distribute to the parties involved templates for work <br />specified to be factory prepared and field installed. Check Shop Drawings of other <br />portions of the Work to confirm that adequate provisions are made for locating and <br />installing products to comply with indicated requirements. <br />H. Attachment: Provide blocking and attachment plates and anchors and fasteners of <br />adequate size and number to securely anchor each component in place, accurately <br />located and aligned with other portions of the Work. Where size and type of <br />attachments are not indicated, verify size and type required for load conditions. <br />1. Mounting Heights: Where mounting heights are not indicated, mount <br />components at heights directed by Architect. <br />2. Allow for building movement, including thermal expansion and contraction. <br />3. Coordinate installation of anchorages. Furnish setting drawings, templates, <br />and directions for installing anchorages, including sleeves, concrete inserts, <br />anchor bolts, and items with integral anchors, that are to be embedded in <br />concrete or masonry. Deliver such items to Project site in time for installation. <br />I. Joints: Make joints of uniform width. Where joint locations in exposed work are not <br />indicated, arrange joints for the best visual effect. Fit exposed connections together <br />to form hairline joints. <br />J. Remove and replace damaged, defective, or non-conforming Work.
The URL can be used to link to this page
Your browser does not support the video tag.