Laserfiche WebLink
Gateway Park Center PERKINS+WILL <br /> 810495.00 <br />12/06/18 <br />031000-1 Concrete Formwork <br />SECTION 031000 <br />CONCRETE FORMWORK <br />PART 1 - GENERAL <br />1.1 GENERAL <br />Work of this Section shall conform to requirements of Drawings and general provisions <br />of the Contract, including General and Supplementary Conditions and Division 1 <br />Specification sections. <br />1.2 SCOPE <br />Provide all labor, materials, equipment, services and transportation for formwork and <br />related accessories required to complete all cast-in-place concrete work as shown on <br />Drawings, as specified herein, and as required by the job conditions. <br />1.3 RELATED WORK SPECIFIED IN OTHER SECTIONS <br />Submittals Division 1 <br />Quality Control Division 1 <br />Concrete Reinforcement and Embedded Assemblies Section 032000 <br />Cast-in-Place Concrete Section 033000 <br />Thermal and Moisture Protection Division 7 <br />1.4 CODES AND STANDARDS <br />A.Building Code: Concrete work shall conform to the requirements of the Building <br />Code identified on the Structural General Notes, and OSHA requirements, except <br />where more stringent conditions or criteria occur in the standards referenced <br />below and on the Drawings. <br />B.Standards: <br />1.ACI 117 – Standard Specifications for Tolerances for Concrete <br />Construction and Materials. <br />2.ACI 237 – Self Consolidating Concrete. <br />3.ACI 301 –Specifications for Structural Concrete. <br />4.ACI 318 – Building Code Requirements for Structural Concrete and <br />Commentary. <br />5.ACI 347 – Guide to Formwork for Concrete. <br />6.ACI 347.2R – Guide for Shoring/Reshoring of Concrete Multistory <br />Buildings