My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br />810495.000 <br />12/06/18 <br />responsibilities may include compensation to Architect for redesign and <br />evaluation services, increased cost of other construction by Owner, and <br />similar considerations. <br />b. Requested substitution does not require extensive revisions to the <br />Contract Documents. <br />c. Requested substitution is consistent with the Contract Documents and <br />will produce indicated results . <br />d . Requested Substitution is in compliance with the design intent and <br />client's brand standards. <br />e. Substitution request is fully documented and properly submitted. <br />f. Requested substitution will not adversely affect Contractor's <br />construction schedule. <br />g. Requested substitution has received necessary approvals of authorities <br />having jurisdiction. <br />h. Requested substitution is compatible with other portions of the Work. <br />i. Requested substitution has been coordinated with other portions of the <br />Work. <br />j. Requested substitution provides specified warranty. <br />k. If requested substitution involves more than one contractor, requested <br />substitution has been coordinated with other portions of the Work, is <br />uniform and consistent, is compatible with other products, and is <br />acceptable to all contractors involved. <br />PART 2 -PRODUCTS (Not Used) <br />PART 3 -EXECUTION (Not Used) <br />END OF SECTION <br />SUBSTITUTION PROCEDURES <br />01 25 00 -4
The URL can be used to link to this page
Your browser does not support the video tag.