My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center <br />REQUEST FOR SUBSTITUTION <br />TO: Perkins+ Will <br />FROM: <br />806 Douglas Road, Suite 300 <br />Coral Gables, FL 33134 <br />Name of manufacturer <br />Street address <br />City and state <br />Phone number and name of person to contact <br />PROJECT: Name: <br />1. <br />2. <br />City, State: <br />Gateway Park Center <br />Sunny Isles Beach, Florida <br />Architect's Job Number: 810495.000 <br />Specification Section and Paragraph numbers of product specified <br />Proposed Substitute <br />A.Name and Model No.: <br />B.Description: <br />PERKINS+ WILL <br />810495.000 <br />12/06/18 <br />C.Attach applicable Submittals as required by the referenced Specification Sec <br />tion, i.e. Product Data, Materials List, Shop Drawings, Samples, Design Data, <br />Test Reports, and Certificates. Attach Shop Drawings to the effect of the pro <br />posed substitution on adjacent components of the Work. <br />D.Insert Numbers of applicable reference standards: <br />E.Attach a color chart, if applicable. <br />F.Attach installation instructions. <br />3.Manufacturer's Reputation: Attach the following: <br />A.Evidence of reputation for prompt delivery. <br />B.Evidence of reputation for efficiency in servicing products. <br />4.Comparison: Attach an itemized comparison of the proposed substitution with <br />product specified. Significant qualities may include elements such as size, weight, <br />durability, performance, and visual effects. <br />5.Changes in Work: Attach data relating to changes required in other work to permit <br />use of proposed substitution and changes required in construction schedule and <br />SUBSTITUTION PROCEDURES <br />01 25 00 - 5
The URL can be used to link to this page
Your browser does not support the video tag.