My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br />810495.000 <br />12/06/18 <br />overall contract time. Coordinate changes or modifications needed to other parts of <br />the Work and to construction performed by the Owner and separate Contractors that <br />will be necessary to accommodate the proposed substitution. <br />6. Cost Data: Attach accurate cost data on proposed substitution in comparison with <br />product specified. <br />7. Previous Installation : Provide the following information on similar projects on which <br />proposed substitution was used, list projects in the locale of the project primarily and <br />then in other areas that best represent its application on this project: <br />Name and Address <br />of Project <br />A. <br />B. <br />C. <br />D . <br />Date of <br />Installation <br />Name, Address, and <br />Phone # of Architect <br />8. In making a request for substitution, the Manufacturer represents that: <br />A. He has ex amined the Drawings and Specifications and has determined that, to <br />the best of his knowledge, the proposed substitution is appropriate for the use <br />intended in the Drawings and Specifications. <br />B. He will provide the same or better warranty for substitution as for product or <br />method specified. <br />C. The product is equal or better in quality and serviceability to the specified item. <br />9. In making a request for substitution, the Installer and Contractor each represents <br />that: <br />A. He will coordinate the installation of accepted substitution into the Work, mak- <br />ing such changes as may be required for the Work to be complete in all re- <br />spects. <br />B. He waives all claims for additional costs related to substitution which conse- <br />quently become apparent. <br />SUBSTITUTION PROCEDURES <br />01 25 00 -6
The URL can be used to link to this page
Your browser does not support the video tag.