My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />STYRENE-BUTADIENE-STYRENE (SBS) MODIFIED BITUMINOUS MEMBRANE ROOFING <br /> 07 52 16 - 17 <br /> <br /> <br />1. When remaining construction does not affect or endanger roofing, inspect <br />roofing system for deterioration and damage, describing its nature and extent <br />in a written report, with copies to Architect and Owner. <br />B. Correct deficiencies in or remove roofing system that does not comply with <br />requirements, repair substrates, and repair or reinstall roofing system to a <br />condition free of damage and deterioration at time of Substantial Completion and <br />according to warranty requirements. <br />C. Clean overspray and spillage from adjacent construction using cleaning agents and <br />procedures recommended by manufacturer of affected construction. <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.