My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />ROOF ACCESSORIES <br /> 07 72 00 - 1 <br /> <br /> <br />SECTION 07 72 00 - ROOF ACCESSORIES <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. Section Includes: <br />1. Roof curbs. <br />B. Related Requirements: <br />1. Section 07 62 00 "Sheet Metal Flashing and Trim" for shop- and field-formed <br />metal flashing, and miscellaneous sheet metal trim and accessories. <br />1.2 COORDINATION <br />A. Coordinate layout and installation of roof accessories with roofing membrane and <br />base flashing and interfacing and adjoining construction to provide a leakproof, <br />weathertight, secure, and noncorrosive installation. <br />B. Coordinate dimensions with rough-in information or Shop Drawings of equipment to <br />be supported. <br />1.3 ACTION SUBMITTALS <br />A. Product Data: For each type of roof accessory. <br />1. Include construction details, material descriptions, dimensions of individual <br />components and profiles, and finishes. <br />B. Shop Drawings: For roof accessories. <br />1. Include plans, elevations, keyed details, and attachments to other work. <br />Indicate dimensions, loadings, and special conditions. Distinguish between <br />plant- and field-assembled work. <br />C. Delegated-Design Submittal: For roof curbs indicated to comply with performance <br />requirements and design criteria, including analysis data signed and sealed by the <br />qualified professional engineer responsible for their preparation. <br />1. Detail mounting, securing, and flashing of roof-mounted items to roof <br />structure. Indicate coordinating requirements with roof membrane system.
The URL can be used to link to this page
Your browser does not support the video tag.