My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />CONTRACT MODIFICATION PROCEDURES <br /> 01 26 00 - 2 <br /> <br /> <br />2. Include a list of quantities of products required or eliminated and unit costs, <br />with total amount of purchases and credits to be made. If requested, furnish <br />survey data to substantiate quantities. <br />3. Indicate applicable taxes, delivery charges, equipment rental, and amounts of <br />trade discounts. <br />4. Include costs of labor and supervision directly attributable to the change. <br />5. Include an updated Contractor's construction schedule that indicates the <br />effect of the change, including, but not limited to, changes in activity <br />duration, start and finish times, and activity relationship. Use available total <br />float before requesting an extension of the Contract Time. <br />6. Comply with requirements in Section 01 25 00 "Substitution Procedures" if <br />the proposed change requires substitution of one product or system for <br />product or system specified. <br />1.4 CHANGE ORDER PROCEDURES <br />A. On Owner's approval of a Work Change Proposal Request, Construction Manager <br />will issue a Change Order for signatures of Owner and Contractor on form included <br />in Project Manual. <br />1.5 CONSTRUCTION CHANGE DIRECTIVE <br />A. Construction Change Directive: Architect, Program Manager or Construction <br />Manager may issue a Construction Change Directive on form included in Project <br />Manual. Construction Change Directive instructs Contractor to proceed with a <br />change in the Work, for subsequent inclusion in a Change Order. <br />1. Construction Change Directive contains a complete description of change in <br />the Work. It also designates method to be followed to determine change in <br />the Contract Sum or the Contract Time. <br />B. Documentation: Maintain detailed records on a time and material basis of work <br />required by the Construction Change Directive. <br />1. After completion of change, submit an itemized account and supporting data <br />necessary to substantiate cost and time adjustments to the Contract. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION (Not Used) <br />END OF SECTION
The URL can be used to link to this page
Your browser does not support the video tag.