My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />HOLLOW METAL DOORS AND FRAMES <br /> 08 11 13 - 6 <br /> <br /> <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Examine substrates, areas, and conditions, with Installer present, for compliance <br />with requirements for installation tolerances and other conditions affecting <br />performance of the Work. <br />B. Examine roughing-in for embedded and built-in anchors to verify actual locations <br />before frame installation. <br />C. Prepare written report, endorsed by Installer, listing conditions detrimental to <br />performance of the Work. <br />D. Proceed with installation only after unsatisfactory conditions have been corrected. <br />3.2 PREPARATION <br />A. Remove welded-in shipping spreaders installed at factory. Restore exposed finish <br />by grinding, filling, and dressing, as required to make repaired area smooth, flush, <br />and invisible on exposed faces. <br />B. Drill and tap doors and frames to receive nontemplated, mortised, and surface- <br />mounted door hardware. <br />3.3 INSTALLATION <br />A. General: Install hollow-metal work plumb, rigid, properly aligned, and securely <br />fastened in place. Comply with Drawings and manufacturer's written instructions. <br />B. Hollow-Metal Frames: Install hollow-metal frames for doors, transoms, sidelites, <br />borrowed lites, and other openings, of size and profile indicated. Comply with <br />SDI A250.11 as required by standards specified. <br />1. Set frames accurately in position; plumbed, aligned, and braced securely until <br />permanent anchors are set. After wall construction is complete, remove <br />temporary braces, leaving surfaces smooth and undamaged. <br />a. Where frames are fabricated in sections because of shipping or handling <br />limitations, field splice at approved locations by welding face joint <br />continuously; grind, fill, dress, and make splice smooth, flush, and <br />invisible on exposed faces. <br />b. Install frames with removable stops located on secure side of opening. <br />c. Install door silencers in frames before grouting. <br />d. Remove temporary braces necessary for installation only after frames <br />have been properly set and secured. <br />e. Check plumb, square, and twist of frames as walls are constructed. <br />Shim as necessary to comply with installation tolerances. <br />f. Field apply bituminous coating to backs of exterior frames that will be <br />filled with grout containing antifreezing agents.
The URL can be used to link to this page
Your browser does not support the video tag.