My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />FLUSH WOOD DOORS <br /> 08 14 16 - 2 <br /> <br /> <br />1. Egress Door Inspector: Submit documentation of compliance with NFPA 101, <br />Section 7.2.1.15.4. <br />2. Submit copy of DHI's Fire and Egress Door Assembly Inspector (FDAI) <br />certificate. <br />B. Sample Warranty: For special warranty. <br />1.4 CLOSEOUT SUBMITTALS <br />A. Special warranties. <br />B. Quality Standard Compliance Certificates: AWI Quality Certification Program <br />certificates. <br />1.5 QUALITY ASSURANCE <br />A. Manufacturer's Certification: Licensed participant in AWI's Quality Certification <br />Program. <br />B. Egress Door Inspector Qualifications: Inspector for field quality-control inspections <br />of egress door assemblies shall comply with qualifications set forth in NFPA 101, <br />Section 7.2.1.15.4 and the following: <br />1. DHI's Fire and Egress Door Assembly Inspector (FDAI) certification. <br />1.6 DELIVERY, STORAGE, AND HANDLING <br />A. Comply with requirements of referenced standard and manufacturer's written <br />instructions. <br />B. Package doors individually in plastic bags or cardboard cartons. <br />C. Mark each door on top and bottom rail with opening number used on Shop <br />Drawings. <br />1.7 FIELD CONDITIONS <br />A. Environmental Limitations: Do not deliver or install doors until building is enclosed <br />and weathertight, wet work is complete, and HVAC system is operating and <br />maintaining temperature between 60 and 90 deg F and relative humidity between <br />25 and 55 percent during remainder of construction period. <br />1.8 WARRANTY <br />A. Special Warranty: Manufacturer agrees to repair or replace doors that fail in <br />materials or workmanship within specified warranty period. <br />1. Failures include, but are not limited to, the following:
The URL can be used to link to this page
Your browser does not support the video tag.