My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (3)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 1:53:00 PM
Creation date
1/31/2019 1:35:01 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />DEMOUNTABLE PARTITIONS <br />10 22 19 - 8 <br /> <br /> <br />3. Finished floor must be level with a maximum total variation of 1/4" from the <br />highest to the lowest point throughout the entire length of the telescopic door. <br />4. Structural support and blocking is required and to be provided by the contractor. <br />Final structural requirements, based on provided point loads and maximum <br />allowed deflection, to be determined by Architect and Structural Engineer. <br />PART 3 - EXECUTION <br />3.1 EXAMINATION <br />A. Do not begin installation until substrates have been properly prepared. <br />B. Verify prepared openings are in accordance with Shop Drawings. <br />C. Verify wall openings are ready to receive work of this section. <br />3.2 PREPARATION <br />A. Clean surfaces thoroughly prior to installation. <br />B. Prepare surfaces using methods recommended by the manufacturer for achieving the <br />best result for the substrate under the project conditions. <br />3.3 INSTALLATION <br />A. General: Install demountable partitions after other finishing operations have been <br />completed. <br />1. Install in accordance with manufacturer’s instructions. <br />2. Install partitions rigid, level, plumb, and aligned. Install seals at connections <br />with floors, ceilings, fixed walls, and abutting surfaces to prevent light and <br />sound transmission. <br />3. Broken, cracked, chipped, deformed, or unmatched panels and components are <br />not acceptable. <br />4. Except for filler panels scribed to fixed walls or columns, do not modify <br />manufacturer's standard components. <br />B. Install demountable glass walls and accessories after other finishing operations, <br />including painting, have been completed. <br />C. Match glazing by installing from marked packages in numbered sequence indicated on <br />Shop Drawings. <br />D. Align assembly plumb and to indicated position, free of warp or twist. Maintain <br />assembly dimensional tolerances, aligning with adjacent work. <br />E. Suspended-Ceiling System: Make alterations to suspended-ceiling system required by <br />partition installation or to gain access to electrical or communication systems without
The URL can be used to link to this page
Your browser does not support the video tag.