My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (4)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 3:20:12 PM
Creation date
1/31/2019 3:00:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />SUBMITTAL PROCEDURES <br /> 01 33 00 - 3 <br /> <br /> <br />B. Coordination: Coordinate preparation and processing of submittals with <br />performance of construction activities. <br />1. Coordinate each submittal with fabrication, purchasing, testing, delivery, <br />other submittals, and related activities that require sequential activity. <br />2. Submit all submittal items required for each Specification Section concurrently <br />unless partial submittals for portions of the Work are indicated on approved <br />submittal schedule. <br />3. Submit action submittals and informational submittals required by the same <br />Specification Section as separate packages under separate transmittals. <br />C. Processing Time: Allow time for submittal review, including time for resubmittals, <br />as follows. Time for review shall commence on Architect's receipt of submittal. No <br />extension of the Contract Time will be authorized because of failure to transmit <br />submittals enough in advance of the Work to permit processing, including <br />resubmittals. <br />1. Initial Review: Allow 10 working days for initial review of each submittal. <br />Allow additional time if coordination with subsequent submittals is required. <br />Architect will advise Contractor when a submittal being processed must be <br />delayed for coordination. <br />2. Resubmittal Review: Allow 10 working days for review of each resubmittal. <br />D. Resubmittals: Make resubmittals in same form and number of copies as initial <br />submittal. <br />E. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, <br />suppliers, fabricators, installers, authorities having jurisdiction, and others as <br />necessary for performance of construction activities. Show distribution on <br />transmittal forms. <br />F. Use for Construction: Retain complete copies of submittals on Project site. Use only <br />final action submittals that are marked with approval notation from Architect's <br />action stamp. <br />1.6 SUBMITTAL REQUIREMENTS <br />A. Product Data: Collect information into a single submittal for each element of <br />construction and type of product or equipment. <br />1. If information must be specially prepared for submittal because standard <br />published data are unsuitable for use, submit as Shop Drawings, not as <br />Product Data. <br />2. Mark each copy of each submittal to show which products and options are <br />applicable. <br />3. Include the following information, as applicable: <br />a. Manufacturer's catalog cuts. <br />b. Manufacturer's product specifications. <br />c. Standard color charts. <br />d. Statement of compliance with specified referenced standards. <br />e. Testing by recognized testing agency.
The URL can be used to link to this page
Your browser does not support the video tag.