My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (4)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 3:20:12 PM
Creation date
1/31/2019 3:00:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />SUBMITTAL PROCEDURES <br /> 01 33 00 - 4 <br /> <br /> <br />f. Application of testing agency labels and seals. <br />g. Notation of coordination requirements. <br />h. Availability and delivery time information. <br />4. For equipment, include the following in addition to the above, as applicable: <br />a. Wiring diagrams that show factory-installed wiring. <br />b. Printed performance curves. <br />c. Operational range diagrams. <br />d. Clearances required to other construction, if not indicated on <br />accompanying Shop Drawings. <br />5. Submit Product Data before Shop Drawings, and before or concurrent with <br />Samples. <br />B. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do <br />not base Shop Drawings on reproductions of the Contract Documents or standard <br />printed data. <br />1. Preparation: Fully illustrate requirements in the Contract Documents. Include <br />the following information, as applicable: <br />a. Identification of products. <br />b. Schedules. <br />c. Compliance with specified standards. <br />d. Notation of coordination requirements. <br />e. Notation of dimensions established by field measurement. <br />f. Relationship and attachment to adjoining construction clearly indicated. <br />g. Seal and signature of professional engineer if specified. <br />2. Paper Sheet Size: Except for templates, patterns, and similar full-size <br />Drawings, submit Shop Drawings on sheets at least 8-1/2 by 11 inches, but <br />no larger than 30 by 42 inches. <br />a. Three opaque (bond) copies of each submittal. Architect will return one <br />copy. <br />C. Samples: Submit Samples for review of kind, color, pattern, and texture for a check <br />of these characteristics with other materials. <br />1. Transmit Samples that contain multiple, related components such as <br />accessories together in one submittal package. <br />2. Identification: Permanently attach label on unexposed side of Samples that <br />includes the following: <br />a. Project name and submittal number. <br />b. Generic description of Sample. <br />c. Product name and name of manufacturer. <br />d. Sample source. <br />e. Number and title of applicable Specification Section. <br />f. Specification paragraph number and generic name of each item.
The URL can be used to link to this page
Your browser does not support the video tag.