Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />QUALITY REQUIREMENTS <br />01 40 00 - 8 <br /> <br /> <br />necessity of removing and replacing construction to accommodate testing and <br />inspection. <br />1. Schedule times for tests, inspections, obtaining samples, and similar <br />activities. <br />1.10 SPECIAL TESTS AND INSPECTIONS <br />A. Special Tests and Inspections: Engage a qualified testing agency or special <br />inspector to conduct special tests and inspections required by authorities having <br />jurisdiction as the responsibility of Owner, and as follows: <br />1. Verifying that manufacturer maintains detailed fabrication and quality-control <br />procedures and reviewing the completeness and adequacy of those <br />procedures to perform the Work. <br />2. Notifying Architect and Contractor promptly of irregularities and deficiencies <br />observed in the Work during performance of its services. <br />3. Submitting a certified written report of each test, inspection, and similar <br />quality-control service to Architect with copy to Contractor and to authorities <br />having jurisdiction. <br />4. Submitting a final report of special tests and inspections at Substantial <br />Completion, which includes a list of unresolved deficiencies. <br />5. Interpreting tests and inspections and stating in each report whether tested <br />and inspected work complies with or deviates from the Contract Documents. <br />6. Retesting and reinspecting corrected work. <br />PART 2 - PRODUCTS (Not Used) <br />PART 3 - EXECUTION <br />3.1 TEST AND INSPECTION LOG <br />A. Test and Inspection Log: Prepare a record of tests and inspections. Include the <br />following: <br />1. Date test or inspection was conducted. <br />2. Description of the Work tested or inspected. <br />3. Date test or inspection results were transmitted to Architect. <br />4. Identification of testing agency or special inspector conducting test or <br />inspection. <br />B. Maintain log at Project site. Post changes and revisions as they occur. Provide <br />access to test and inspection log for Architect's reference during normal working <br />hours. <br />1. Submit log at Project closeout as part of Project Record Documents.