My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (4)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 3:20:12 PM
Creation date
1/31/2019 3:00:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />TEMPORARY FACILITIES AND CONTROLS <br />01 50 00 - 1 <br /> <br /> <br />SECTION 01 50 00 - TEMPORARY FACILITIES AND CONTROLS <br />PART 1 - GENERAL <br />1.1 SUMMARY <br />A. Section includes requirements for temporary utilities, support facilities, and security <br />and protection facilities. <br />B. Related Requirements: <br />1. Section 01 10 00 "Summary" for work restrictions and limitations on utility <br />interruptions. <br />1.2 USE CHARGES <br />A. General: Installation and removal of and use charges for temporary facilities shall <br />be included in the Contract Sum unless otherwise indicated. Allow other entities <br />engaged in the Project to use temporary services and facilities without cost, <br />including, but not limited to, Owner's construction and installation forces, <br />Architect, occupants of Project, testing agencies, and authorities having jurisdiction. <br />B. Water and Sewer Service from Existing System: Water from Owner's existing water <br />system is available for use without metering and without payment of use charges. <br />Provide connections and extensions of services as required for construction <br />operations. <br />C. Electric Power Service from Existing System: Electric power from Owner's existing <br />system is available for use without metering and without payment of use charges. <br />Provide connections and extensions of services as required for construction <br />operations. <br />1.3 INFORMATIONAL SUBMITTALS <br />A. Site Utilization Plan: Show temporary facilities, temporary utility lines and <br />connections, staging areas, construction site entrances, vehicle circulation, and <br />parking areas for construction personnel. <br />B. Project Identification and Temporary Signs: Show fabrication and installation <br />details, including plans, elevations, details, layouts, typestyles, graphic elements, <br />and message content. <br />C. Erosion- and Sedimentation-Control Plan: Show compliance with requirements of <br />EPA Construction General Permit or authorities having jurisdiction, whichever is <br />more stringent.
The URL can be used to link to this page
Your browser does not support the video tag.