My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gateway Park Technical Specs Volume 1 (4)
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Gateway Park Technical Specs Volume 1 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 3:20:12 PM
Creation date
1/31/2019 3:00:57 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
724
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />TEMPORARY FACILITIES AND CONTROLS <br />01 50 00 - 2 <br /> <br /> <br />D. Fire-Safety Program: Show compliance with requirements of NFPA 241 and <br />authorities having jurisdiction. Indicate Contractor personnel responsible for <br />management of fire-prevention program. <br />E. Moisture-and Mold-Protection Plan: Describe procedures and controls for protecting <br />materials and construction from water absorption and damage and mold. <br />F. Dust- and HVAC-Control Plan: Submit coordination drawing and narrative that <br />indicates the dust- and HVAC-control measures proposed for use, proposed <br />locations, and proposed time frame for their operation. Include th e following: <br />1. Locations of dust-control partitions at each phase of work. <br />2. HVAC system isolation schematic drawing. <br />3. Location of proposed air-filtration system discharge. <br />4. Waste-handling procedures. <br />5. Other dust-control measures. <br />1.4 QUALITY ASSURANCE <br />A. Electric Service: Comply with NECA, NEMA, and UL standards and regulations for <br />temporary electric service. Install service to comply with NFPA 70. <br />B. Tests and Inspections: Arrange for authorities having jurisdiction to test and <br />inspect each temporary utility before use. Obtain required certifications and <br />permits. <br />C. Accessible Temporary Egress: Comply with applicable provisions in t he United <br />States Access Board's ADA-ABA Accessibility Guidelines and ICC/ANSI A117.1. <br />1.5 PROJECT CONDITIONS <br />A. Temporary Use of Permanent Facilities: Engage Installer of each permanent service <br />to assume responsibility for operation, maintenance, and protection of each <br />permanent service during its use as a construction facility before Owner's <br />acceptance, regardless of previously assigned responsibilities. <br />PART 2 - PRODUCTS <br />2.1 TEMPORARY FACILITIES <br />A. Field Offices, General: Prefabricated or mobile units with serviceable finishes, <br />temperature controls, and foundations adequate for normal loading. <br />B. Common-Use Field Office: Of sufficient size to accommodate needs of Owner, <br />Architect, and construction personnel office activities and to accommodate Project <br />meetings specified in other Division 01 Sections. Keep office clean and orderly. <br />Furnish and equip offices as follows:
The URL can be used to link to this page
Your browser does not support the video tag.