Laserfiche WebLink
Gateway Park Center PERKINS+WILL <br /> 810495.000 <br /> 12/06/18 <br /> <br /> <br />TEMPORARY FACILITIES AND CONTROLS <br />01 50 00 - 3 <br /> <br /> <br />1. Furniture required for Project-site documents including file cabinets, plan <br />tables, plan racks, and bookcases. <br />2. Conference room of sufficient size to accommodate meetings of 10 <br />individuals. Provide electrical power service and 120-V ac duplex receptacles, <br />with no fewer than one receptacle on each wall. Furnish room with conference <br />table, chairs, and 4-foot- square tack and marker boards. <br />3. Drinking water and private toilet. <br />4. Heating and cooling equipment necessary to maintain a uniform indoor <br />temperature of 68 to 72 deg F <br />5. Lighting fixtures capable of maintaining average illumination of 20 fc at desk <br />height. <br />2.2 EQUIPMENT <br />A. Fire Extinguishers: Portable, UL rated; with class and extinguishing agent as <br />required by locations and classes of fire exposures. <br />B. HVAC Equipment: Unless Owner authorizes use of permanent HVAC system, <br />provide vented, self-contained, liquid-propane-gas or fuel-oil heaters with individual <br />space thermostatic control. <br />1. Use of gasoline-burning space heaters, open-flame heaters, or salamander- <br />type heating units is prohibited. <br />2. Heating Units: Listed and labeled for type of fuel being consumed, by a <br />qualified testing agency acceptable to authorities having jurisdiction, and <br />marked for intended location and application. <br />3. Permanent HVAC System: If Owner authorizes use of permanent HVAC <br />system for temporary use during construction, provide filter with MERV of 8 <br />at each return-air grille in system and remove at end of construction and <br />clean HVAC system as required in Section 01 77 00 "Closeout Procedures. <br />C. Air-Filtration Units: Primary and secondary HEPA-filter-equipped portable units with <br />four-stage filtration. Provide single switch for emergency shutoff. Configure to run <br />continuously. <br />PART 3 - EXECUTION <br />3.1 TEMPORARY FACILITIES, GENERAL <br />A. Conservation: Coordinate construction and use of temporary facilities with <br />consideration given to conservation of energy, water, and materials. Coordinate use <br />of temporary utilities to minimize waste. <br />1. Salvage materials and equipment involved in performance of, but not actually <br />incorporated into, the Work. See other Sections for disposition of salvaged <br />materials that are designated as Owner's property.