Laserfiche WebLink
RCP SHELTER , INC. <br />2100 SE Rays Way - Stuart; FL 34944 <br />PRC,I10j1 I..%[]RDFT'. FORM (CON7! i%.1-0: D) P:S00-525-0203 * 772-288.3 WO <br />F: 772288-0207 <br />Proposal #; 29583 info@rcpshelters,com 1 http://www.rcpshelters.com <br />Manatee COU MY' MOD No. 16-0025-M R Can tract <br />'town Center Park - Sunny isles deach, FL <br />D ETA I LS <br />DESIGN f EKINHAING <br />+ ProposaI based on design by RCP Shelters, not necessarily an exact match to bid or architectural drawings- <br />• RCP +slue englneers for minimum number of columns to keep the pavilion as open and accessible as possible. Final design may <br />not reflect the same number of columns or members, sizes, or sparing as images on RCP's website and catalog or preliminary <br />drawing. <br />m Please allow approxrmately 2-3 weeks for engineered dim, wings after receipt of order and other pertinent design requirements, <br />Custom designs may take 4 weeks or longer. All lead times are subject to change basiod on current dernind, <br />• Design requirements not disclosed to RCP prior to proposal, or required revisions resulting from Information not disclosed at Urn <br />of order are subject to additional cNirge. Corn man examples: <br />o All pertinerit found atlon information, including but not limited to geotechnical report, maximum depth forwatcr tabic, or <br />installations nor or i:onnertI0n to other structures (drift snow loads), Or any other site specific request/requirement must be <br />provided with order. Without this information, RCP reserves the right to re -quote or charge addltlonal englnee ring fee, <br />o Proposal Includes standardfoundation based on assurned soil values (minimum 2' diam6t0r& d' deep –can be much larger <br />depending on loading conditions and size of structure). Foundations maybe designed by others with RCP provided column <br />base reactions. Custom foundation designs may be available for addltional fee. <br />a Electrical or other custom cutouts not specifically included in the proposal are Subject to additional angIneering, drafting, and <br />fabricatlon fees. <br />b Local code may have requirements that are not the responsibility of RCP (examples; NJ architectural stamp, FL fire barrier board). <br />fi Foch project is designed for its specific location after receipt of order. Oocaslonally, engrneering dctcrmines that matcrials not <br />included In the proposal are required. Such materlals shall be provided by others (example: OSB ciiaphragril is sometimes required <br />on larger LW -G and bandsheli models), <br />o Drawings provided by RCR Shelters with this proposal are preliminary, and are not far construction, Owner can pre purchase <br />engtneered drawings, which detail the project specific foundation design and material requirements, with no obligation to <br />purchase the entire structure. <br />FABRICA7iON / $NipoNG DOTAILs <br />v Nbrlcatlon lead tlmes vary by season, typically 6.8 weiAs after receipt of approved drawings, color selections, and fabrl cation <br />deposit. <br />* Freight price Is based on pooled loads. <br />Upgrade to dedicated truck or split shlpment Is available for an additional fee. <br />Shipping date's are not guaranteed. RCP does not accept orders with penalties or contingent liability. <br />u Trucking will call at least 24 hours prior to delivery to coordinate. <br />e Unload[N by others, RCP recommends non -marring padded slings and padded forks for offloading. Block all materials off ground <br />and cover with moisture resistant paper until Installation. <br />INSTALLAVON COST SAVING ADVANTAGES <br />Column anchor bolts located outside the column tube (easily accessible for installation) <br />0 Factory cut roofing panel end caps {minimal, if any, on site cutting required) <br />+ Factory fabricatod roofing seam and corner caps (minirnal, if any, on site rutting or rahriration requiredt <br />Metal roofing and po'lvder coating touch up paint included <br />When applicable, one.piece, factory welded gable beams vs, numerous place field assemblies (no on site assembly required) <br />• When applicable, one-piece, factory welded clerestory beams vs. numerous piece field assemblies (no an site assembly required) <br />When applicabie, factory assembled cupola (noon site assembly required) <br />............ -- — - ......... Page <br />iSrgnaturej (Print/iltie) toatcl <br />V5slynarwe confirms aeseptPrrce of Opoges of INS procural. <br />