My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2019-2929
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2019
>
Reso 2019-2929
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/1/2019 4:23:42 PM
Creation date
3/22/2019 11:19:27 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2019-2929
Date (mm/dd/yyyy)
03/21/2019
Description
Approve Agreement w/RCP Shelters, Inc. for Gazebo at Town Center Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TECHNICAL. SPECIFICATIONS <br />Proposal #: 29583 <br />I. DESIGN CRITERIA <br />Structure shall be designed to be free standing, open air pavilion in conformance with all applicable building code. <br />Manufactured by RCP Shelters: 2100 SE Rays Way, Stuart, FL 34994 • Toll-free: 800-525-0207 • F:772-288.0207 <br />http,//www.rc helters.cam • info@ rcosheiters.com, <br />11. SCOPE <br />Structure shall be an all steel pavilion over'a 4" minimum thickness reinforced concrete slab. Shelter shall have a clear space, <br />without.a center column or open knee bracing. Structure shall be designed by professional engineers. The owner or contractor <br />shall be responsible for unloading, temporary storage, soil testing (if necessary), site preparation, concrete slab, and erection of <br />structures. Owner or contractor Is responsible for protection of materials after arrival. <br />III, COLUMNS <br />The shelter shall be set on prepared footings. Foundation shall be engineered to manufacturer's design and constructed to local <br />code and good construction practices for the specific site conditions. The structure shall have tube steel corner columns. The <br />columns shall be attached to the top of the concrete foundation by use of anchor bolts, hidden when possible. Anchor bolts <br />shall be provided by owner or contractor so that foundations can be prepared and ready for installation upon delivery of the <br />shelter. Alternatively, RCP Shelters offers an anchor bolt option, to be shipped upon receipt of drawing approval for fabrication. <br />iV. FRAME <br />All structural framing of the pavilion shall be structural tube steel with end caps to form a clean, neat appearance with no place <br />for birds to nest or small animals to roost. The compression ringshall be structural steel plate. Since all connections will bolt <br />together, field welding shall not be required. Bolts shall be concealed within the tubing when possible. <br />V. POWDER COAT FINISH <br />The columns and frame shall be sandblasted to near -white condition, five stage washed, including detergent, phosphate, and <br />rust protectant sealant, epoxy primed, then top coated with TGIC powder. The columns and frame shall be packaged in foam, <br />cardboard, and stretch wrap to protect the finish during transit. The color shall be selected from manufacturer's standard color <br />chart. Field touch up painting shall be required by owner or contractor. <br />VI. SAVE I ePITCH <br />Eave height shall be minimum 7'-6". Roof pitch shall be 8:12. <br />VII. ROOFING— MEGARIB(INCLUDED) <br />The roof system shall be structural 24 -gauge exposed fastener Galvalume® panels with UY' high.ribs, 7.2" on center. Ribs shall <br />run with the pitch of the roof for proper drainage. Roof panels shall be 3' wide and precut by the length from the eave to the <br />ridge. Angles shall be factory precut. Matching roof trim & fasteners shall be supplied. Hip and ridge beams shall have cap <br />plates for metal deck bearing, as metal deck cannot structurally bear on beam corner only. Panels and trim shall be pre -painted <br />with the Kynar 5000 paint system. Color shall, be chosen by owner from the standard color chart, provided upon request. <br />A. TRUE STANDING SRAM ROOFING - MEDALLION-LOK (OPTIONAL) <br />True standing seam metal roofing shall be 24 -gauge Galvalume® panels with 1W high snap -together standing <br />seams, with concealed clips, 12",16" or 18" on center, striated. Ribs shall run with the pitch of the roof for proper <br />drainage. Roof panels shall be precut by the length from the eave to the ridge. Angles shall be field cut by <br />Installer. Matching roof trim & fasteners shall be provided. Panels and.trim shall be pre -painted with the Kynar <br />5000 paint system. Color shall he chosen by owner from the standard color chart, provided upon request. <br />VIIi. STEEL RAILINGS (OPTIONAL) <br />Railings shall be Y:" plate steel pickets attached to 2" x 2" tube steel top and bottom rails between columns, Intermediate tube <br />steal posts shall be included and sized as structurally necessary. Railings may be added on all but one side for entry and exit. <br />Owner shall choose design: "P (picket), "0", or' X". <br />RCP Shelters, Inc. • 2100 SE Rays Way, Stuart, FL 34994 Page <br />Toll Free 800.525.0207 - Local 772.288-3600 • Fax 772-288.0207 + info@rcpshelters,com 4 http://www.rcpsheiters.com 4/5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.