My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shift
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-01-01) Gateway Park Center
>
Responses
>
Shiff Construction
>
Shift
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2019 11:09:30 AM
Creation date
5/7/2019 10:37:44 AM
Metadata
Fields
Template:
CityClerk-Special Master Hrg.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALL NUMBERS MUST BE TYPED <br /> CONSTRUCTION DOCUMENT <br /> FOR <br /> 0 SIB-GATEWAY PARK <br /> SUNNY ISLES BEACH,FLORIDA <br /> LEVEL DESCRIPTION TOTAL QUANTITY UN UNIT COST <br /> - CITY OF SUNNY ISLES BEACH-GATEWAY PARK I ILS S <br /> - MAIN PROJECT $ 5,622,818.75 1 LS S <br /> •1 BASE BID-CONSTRUCTION SF $L <br /> +1A BUILDING CONSTRUCTION $ 4,486,167.94 SF l <br /> 18 KITCHEN EQUIPMENT $ 272,771.92 LS 31 <br /> -2 AUDIO VISUAL LS SI <br /> 2A AUDIO VISUAL INFRASTRUCTURE $ 525,539.93 LS $ <br /> 2B AUDIO VISUAL EQUIPMENT Inc in 2A LS Sr <br /> 3 LOOSE FURNITURE LS S( <br /> - ADDITIONAL Below Inc in Base Bid LS Si <br /> +4 KIOSK PLAN Inc w/Bid SF 4 <br /> +5 HALLWAY FINISH Inc w/Bid SF <br /> +6 STORAGE ROOM Inc w/Bid SF 4 <br /> 0 7 ENTRY MAT Inc w/Bid SF i <br /> 8 ADDITIONAL AV Inc w/Bid LS 4 <br /> 9 ADDITIONAL CCTV SYSTEM Inc w/Bid EA 4 <br /> 10 REPLACE EXISTING GLASS DOOR WITH STOREFRONT Inc w/Bid EA 4 <br /> 11 WASHER&DRYER Inc w/Bid EA ;II <br /> +12 ROOF WORK NIP LS q <br /> 13 WINDOW FILM J SF $ <br /> Inc w/Bid <br /> 14 SECURITY TELESCOPING GLASS DOOR Inc w/Bid LS S <br /> 15 ADDITIONAL HVAC TO EXISTING IT ROOM NIP IS S <br /> 0 <br /> Report Date: <br /> Page No.1 of <br />
The URL can be used to link to this page
Your browser does not support the video tag.