Laserfiche WebLink
R 3 CITY.OF`SUNNY ISLES BEACH. <br /> /T ; • 18070 Collins Avenue <br /> X; n Sunny Isles Beach: Florida 33160 ., <br /> 3 Ob O�,- ,% <br /> wwwsibfl.netv : <br /> .. �, v S <br /> _. .1 *� <br /> 14.„. �..f..L.0,• 5" <br /> c14..Of StP4 <br /> 9,„4• <br /> completion of the project. Any omissions of inherent technical functions or classes of work:withyi ` <br /> the specifications and/or statement of work shall not relieve the Bidder from furnishing, installing, <br /> or performing such work where required to the satisfactory completion of the project. <br /> Any errors or omissions in the Specifications or on the Plans, as to the standards of the work, shall <br /> not relieve the Contractor of the obligation to furnish a satisfactory first class job in strict conformity <br /> with the best practice found in structures or in the work of a similar type. The failure of the Bidder <br /> to direct the attention of the City's Project Manager to errors or discrepancies will not relieve the <br /> Bidder should Bidder be awarded the Contract, of the responsibility of performing the work to the <br /> satisfaction of the City. <br /> 2.30 MAJOR SUB-CONTRACTORS: <br /> The Bidder shall identify on the below questionnaire each major subcontractor it expects to engage <br /> for this Contract if the work to be subcontracted is 15% or more of the bid sum or over $50,000, <br /> whichever is less. The Bidder shall not change or replace a subcontractor without approval by the <br /> City. No subcontractor will under any circumstances relieve the Respondent of its liability and <br /> obligation under any resulting contract. Subcontractor is subject to the same contractual conditions <br /> as is the Respondent. <br /> O2.31 LABOR, MATERIALS, AND EQUIPMENT SHALL BE SUPPLIED BY THE CONTRACTOR <br /> The Contractor shall furnish the following, including but not limited to, all labor, material, <br /> equipment, barricading, Maintenance of Traffic (MOT) inclusive of any required off duty police <br /> officers, adequate supervision, and coordination for satisfactory contract performance. Any lane <br /> closures require a City permit prior. When not specifically identified in the technical specifications, <br /> such materials and equipment shall be of a suitable type and grade for the purpose and meeting <br /> or exceeding all permit or industry standard 'requirements. All material, workmanship, 100% <br /> design, testing and equipment shall be subject to the inspection and approval of the City Manager <br /> or his designated representative for this project. Bidder, by virtue of bidding, certifies that any <br /> material or equipment supplied will be 100% asbestos free. <br /> 2.32 SUBSTITUTE MATERIAL AND EQUIPMENT <br /> Whenever materials or equipment are specified or described in the Contract Documents by using <br /> the name of a proprietary item or the name of a particular Supplier the naming of the item is <br /> intended to establish the type, function and quality required. Unless the name is followed by words <br /> indicating that no substitution is permitted, materials or equipment of other Suppliers may be <br /> accepted by Firm if sufficient information is submitted by Contractor to allow Firm to determine <br /> that the material or equipment proposed is equivalent or equal to that named. If Contractor wishes <br /> to furnish or use a substitute item of material or equipment, Contractor shall make written <br /> application to Firm for acceptance thereof, certifying that the proposed substitute will perform <br /> adequately the functions and achieve the results called for by the general design, be similar and <br /> of equal substance to that specified and be suited to the same use as that specified.The application <br /> must state that the evaluation and acceptance of the proposed substitute will not prejudice <br /> Contractor's achievement of Substantial Completion on time, whether or not acceptance of the <br /> substitute for use in the Work will require a change in any of the Contract Documents (or in the <br /> _. City_oTSunny.l lesBeach a_In'vifation'to.Bid=No..-GATEWAY PAR.KCENTrR..]:0;0.1..01 „?0.-` ` w , A" <br />