My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Shiff's Exhibit 1 - 15
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
Bid Protest
>
ITB 19-01-01 Gateway Park Center
>
Shiff's Exhibit 1 - 15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/16/2019 3:33:26 PM
Creation date
5/16/2019 3:12:50 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Gateway Park Center
Bid No. (xx-xx-xx)
19-01-01
Project Type (Bid, RFP, RFQ)
Bid
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
K . , <br /> CITY'c5F.SUNNY ISLES BEACH <br /> , a <br /> _ 7 ... - _ - � 18070 Collins avenue. R " <br /> i::,=',1 "� �, Sunny Isles Beach, Florida 3316t? ,;�,,)s ',,(., . <br /> x 305 947.0606 c! ��^y_� <br /> �, � F t vvww.sEbFl.Ret u't 1 <br /> ai <br /> , f.10 6 <br /> ^34'OF SUS l'9. <br /> • a-, t.; <br /> The Contract may only be changed by a Change Order approved by the City. Any <br /> increase or decrease in the Contract Price or adjustment in the Contract Time shall be based <br /> on written notice by the Contractor delivered promptly to the City (but in no event later than <br /> seven (7) days) after the acknowledgement or occurrence of the event giving rise to the claim <br /> and stating the general nature of the claim. Within fourteen (14) days thereafter, notice of the <br /> amount of the claim with all supporting data shall cover all amounts (direct, indirect and <br /> consequential) to which the claimant is entitled as a result of the occurrence of said event. All <br /> claims for adjustment in the Contract Price or Contract Time shall be determined by the City. <br /> Contractor acknowledges and agrees that no claim for an adjustment in the Contract Price or <br /> Contract Time will be valid or enforceable if not submitted in strict accordance with this <br /> paragraph. <br /> The value of any Work covered by a Change Order or of any claim for an increase or <br /> decrease in the Contract Price or Contract Time shall be determined by: 1) mutual <br /> acceptance of a lump sum (which may include an allowance for overhead and profit) or 2) by <br /> application of unit prices contained in the Contract Documents to the quantities of the items <br /> involved. The City shall decide, in its sole discretion, whether to issue and agree to a Change <br /> Order, and verbal representations or instructions may not be relied upon by the Contractor. <br /> 0 2.43 GUARANTEES <br /> No guarantee or warranty is given or implied by the City as to a minimum or total amount <br /> of services that may or may not be purchased from any resulting contract or award. The <br /> quantities and frequencies provided herein are for proposal purposes only and will be used for <br /> tabulation and presentation of the bid. The City reserves the right to increase or decrease <br /> service quantities and frequencies, as deemed necessary to serve the best interests of the <br /> City. <br /> 2.44 Correcting Defects Covered Under Warranty <br /> The Contractor shall be responsible for promptly correcting any deficiency, at no cost to the City, <br /> within seven (7) calendar days after the City notifies the Contractor of such deficiency in writing. <br /> If the Contractor fails to satisfy the warranty within the period specified in the notice, the City may <br /> (a) place the Contractor in default of its contract, and/or(b) procure the products or services from <br /> another source and charge the Contractor for any additional costs that are incurred by the City for <br /> this work or items; either through a credit memorandum or through invoicing. <br /> 2.44.1 Owner May Stop the Work <br /> If the Work is defective or Contractor fails to supply sufficiently skilled workers or suitable <br /> materials or equipment, or fails to furnish or perform the Work in such a way that the <br /> completed Work will strictly conform to the Contract Documents, City may order Contractor <br /> to stop the Work,or any portion thereof, until the cause for such order has been eliminated. <br /> 0 <br /> , <br /> -.. City;of.Sunny:Isles..Beath.1_nvitation"td.Bid:.No CA:F WAY PARK CEN,TER.19-U1-01. 24'_ r._= ;::.,, <br />
The URL can be used to link to this page
Your browser does not support the video tag.