My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2019-2952
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2019
>
Reso 2019-2952
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2020 3:31:46 PM
Creation date
6/25/2019 12:36:01 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2019-2952
Date (mm/dd/yyyy)
06/20/2019
Description
Awd ITB 19-01-01 to Nunez Construction for Gateway Park Center Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- ARTICLE VIII:. :._ : <br /> CONTRACT ADMINISTRATION <br /> .,;:t ya•t.?e <br /> 8.1 The Engineer /Architect <br /> 8.1.1 The Engineer/Architect for this project is PERKINS+WILL, c/o Ana Marin,n, 2800 <br /> Ponce de Leon Boulevard, Suite 1300, Coral Gables, .Florida 33164, <br /> ana.marin(a�perkinswill.com, 305.777.9532. In the event the City should find it necessary or <br /> convenient to replace the Engineer/Architect the Citjr shall retain a replacement Engineer/ <br /> Architect and the status of the replacement Engineer / Architect shall be that of the former <br /> Engineer/ <br /> Architect. <br /> 8.2 Engineer/Architect's Administration <br /> 8.2.1 The Engineer / Architect, unless otherwise directed bythe t e City in writing, will <br /> perform those duties and discharge those r <br /> g esponsibilities allocated to the Engineer/Architect <br /> as set forth in this Contract. The Engineer/Architect shall be the City's representative from <br /> the effective date of this Contract until final payment has been made. The Engineer / <br /> Architect shall be authorized to act on behalf of the City only to the extent provided in this <br /> Contract. <br /> 8.2.2 The City and the Contractor shall communicate with each other in the first <br /> instance through the Engineer / Architect. The Contractor and the Engineer / Architect, <br /> however, shall copy the City's designated representative with any and all written <br /> communications by and between the parties. The City's designated representative for the <br /> receipt of any such communications, or copies of same, is Richard Labinsky, Project <br /> Manager, whose address is Cityof SunnyIsles Beach, <br /> 918070 Collins Avenue, Sunny Isles <br /> Beach, FL 33160. The City reserves the right to change its designated representative upon <br /> written notice to the Contractor and Engineer/Architect. <br /> 8.2.3 The Engineer/Architect shall be the initial interpreter of the requirements of the <br /> p <br /> drawings and specifications and the judge of the performance there under by the Contractor. <br /> The Engineer / Architect shall render written or graphic interpretations necessary for the <br /> proper execution or progress of the Work with reasonable promptness on request of the <br /> Contractor. <br /> 8.2.4 The Engineer/Architect will review the Contractor's Applications for Payment <br /> and will certify to the City for payment to the Contractor, those amounts then due the <br /> Contractor as provided in this Contract. <br /> 8.2.5 The Engineer/Architect shall have authority to reject Work which is defective or <br /> does not conform to the requirements of this Contract. If the Engineer/Architect deems it <br /> necessary or advisable, the Engineer / Architect shall have authority to require additional <br /> inspection or testing of the Work for compliance with Contract requirements. <br /> 8.2.6 The Engineer / Architect will review and approve, or take other appropriate <br /> PP <br /> action as necessary, concerning the Contractor's submittals including Shop Drawings, <br /> Product <br /> Data and Samples. <br /> Such review, approval or other action shall be for the sole purpose of determining <br /> conformance with the design concept and information given through the Contract Documents. <br /> 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.