Laserfiche WebLink
Contractor. It is agreed, however:that the Contractor shall.procure and obtain at its sole cost_, <br /> p <br /> and.'expense all change orders, drawings, specifications, permits, approvals, or other <br /> documents required in order to implement the value engineering or cost savings <br /> .". . ,:.,recari,nencitt?cn ANY CLAM. UNDER THIS PARAGRAPH,MUST:BE SUBMITTE.D .N.=__ <br /> WRITING TO THE CITY AND THE.ENGINEER/ARCHITECT PRIOR TO THE EXECUTION <br /> OF THE CHANGE ORDER INCORPORATING THE CONTRACTOR'S RECOMMENDATION <br /> OTHERWISE SAID CLAIM IS EXPRESSLY WAIVED. Any savings allocated to the <br /> Contractor under this Paragraph shall be paid at the time of Final Payment to the Contractor. <br /> 7.16 Miscellaneous <br /> 7.16.1 Prior to commencement of the Work, the Contractor shall submit to the City a <br /> plan for site access and control of construction traffic. Said plan shall include, but not be <br /> limited to, an enumeration of each construction access point to the site and a description of <br /> how access will be controlled and regulated; a description of any impact that construction <br /> traffic may have on the public streets and highways, and the Contractor's plan for minimizing <br /> and reducing such impact; and, the name and address of the individual employed by the <br /> Contractor who shall have responsibility for control and management of construction traffic. <br /> Approval by the City of this plan is a condition precedent to payment of any sums to the <br /> Contractor. The Contractor furthermore agrees to cooperate with the City and all other <br /> appropriate governmental entities with respect to the control, regulation, scheduling and <br /> management of construction traffic. <br /> 7.16.2 The Contractor shall be responsible for, and shall pay the cost of, all temporary <br /> facilities used, or made available, during the course of the Work. These facilities include, but <br /> shall not be limited to, electric power, gas, water, sewage and sanitation, waste removal and <br /> disposal, telephone, and temporary office facilities. The Contractor shall timely pay for all <br /> such temporary facilities and shall coordinate the installation and removal of such facilities <br /> including, but not limited to, any required coordination with any utility company. Furthermore, <br /> the Contractor shall be responsible for, and shall pay the cost of, any utility work which may <br /> be necessary in order to perform the Work required by the Contract Documents; this <br /> responsibility includes, but is not limited to, the cost of installing, moving, or relocating electric, <br /> water, sewer, gasor other utility lines, wires, poles, piand any other equipment of every <br /> kind and nature. <br /> 7.16.3 After first giving at least seventy-two (72) hours written notice to the City and the <br /> Engineer / Architect, the Contractor shall conduct any and all testing required under the <br /> Contract Documents and report the results of same to the City and the Engineer/Architect <br /> within twenty-four (24) hours of receipt unless the City or the Engineer / Architect instructs <br /> otherwise. The Contractor shall also cooperate with the City and the Engineer/Architect in <br /> the event the City or the Engineer/Architect elects to conduct testing for any purpose. The <br /> Contractor shall make the site, or any relevant portion thereof, available for such testing by <br /> the City or the Engineer /Architect and the Contractor shall so schedule and coordinate its <br /> work so as not to interfere with any testing by the City or the Engineer / Architect. When <br /> requested by the City or the Engineer / Architect the Contractor shall furthermore uncover <br /> Work and otherwise assist in testing, as may be required by the City or the Engineer / <br /> Architect. The services requested by the City which are required to be provided by an <br /> Independent Testing Laboratory shall be paid by the City unless otherwise stated in the <br /> Contract Documents. Contractor may not rely upon any testing performed by the City or the <br /> Engineer / Architect but shall remain solely responsible for insuring compliance with all <br /> Contract Documents and testing requirements. The Contractor shall be responsible for the <br /> payment of any of its testing. <br /> 22 <br /> Illi <br />