My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFP 19-07-01 Bella Vista Park Dock Reconstruction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 19-07-01 Bella Vista Park Dock Reconstruction
>
RFP 19-07-01 Bella Vista Park Dock Reconstruction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 2:06:47 PM
Creation date
7/2/2019 2:05:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />City of Sunny Isles Beach | RFP Bella Vista Park Dock Reconstruction 19-07-01 16 <br /> <br />payment if (a) the Work is defective or completed Work has been damaged requiring correction or <br />replacement, (b) the City has been required to correct defective Work or complete Work in <br />accordance with the Contract Documents, or (c) because claims have been made against the City <br />on account of Contractor’s performance or furnishing of the Work or liens or claims have been filed <br />or asserted in connection with the Work or there are other items entitling the City to a set-off <br />against the amount due. No payment will be made for Work performed by the Contractor to replace <br />defective work; for work which is not shown or ordered in the Contract Documents; or additional <br />work performed by Contractor without prior written approval of City. <br /> <br />Invoices shall be supported with detailed information and mailed to: <br />City of Sunny Isles Beach <br />18070 Collins Ave, 4th Floor <br />Sunny Isles Beach, FL 33106 <br />AccountsPayable@sibfl.net <br /> <br />2.17 TAXES <br /> <br />Contractor must pay all applicable sales, consumer, use and other taxes required by law. Contractor <br />is responsible for reviewing the pertinent state statutes involving state taxes and complying with <br />all requirements. <br /> <br />2.18 LABOR, MATERIALS, AND EQUIPMENT SHALL BE SUPPLIED BY THE CONTRACTOR <br /> <br />The Contractor shall furnish the following, including but not limited to, all labor, material, <br />equipment, barricading, Maintenance of Traffic (MOT) inclusive of any required off duty police <br />officers, adequate supervision, and coordination for satisfactory contract performance. When not <br />specifically identified in the technical specifications, such materials and equipment shall be of a <br />suitable type and grade for the purpose and meeting or exceeding all permit or industry standard <br />requirements. All material, workmanship, 100% design, testing and equipment shall be subject to <br />the inspection and approval of the City Manager or his designated representative for this project. <br /> <br />2.19 MATERIALS SHALL BE NEW AND WARRANTED AGAINST DEFECTS <br />The Contractor hereby acknowledges and agrees that all materials, except where recycled content <br />is specifically requested, supplied by the Bidder in conjunction with this solicitation and resultant <br />contract shall be new, warranted for their merchantability, and fit for a particular purpose. In the <br />event any of the materials supplied to the City by the Contractor are found to be defective or do <br />not conform to specifications: (1) the materials may be returned to the Contractor at the <br />Contractor’s expense and the contract cancelled or (2) the City may require the Contractor to <br />replace the materials at the Contractor’s expense. No provisions or allotments for delays or time <br />extensions to the schedule as a result of “defective”, unacceptable material, or reused material <br />found shall be granted. <br /> <br />In the event that material is suspected by the City of being reused or not new in original packaging, <br />the material may be rejected. The Contractor shall remove such material and replace it at his/her <br />cost and within the original schedule. No provisions or allotments for delays or time extensions to <br />the schedule as a result of “defective”, unacceptable material, or reused material found shall be <br />granted.
The URL can be used to link to this page
Your browser does not support the video tag.