My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFP 19-07-01 Bella Vista Park Dock Reconstruction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 19-07-01 Bella Vista Park Dock Reconstruction
>
RFP 19-07-01 Bella Vista Park Dock Reconstruction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 2:06:47 PM
Creation date
7/2/2019 2:05:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />City of Sunny Isles Beach | RFP Bella Vista Park Dock Reconstruction 19-07-01 17 <br /> <br /> <br />2.20 NOTIFICATION TO BEGIN WORK SHALL BE GIVEN THROUGH A NOTICE TO PROCEED <br />The Contractor shall neither commence any work, nor enter a City work premise, until a written <br />Notice to Proceed (NTP) directing the Contractor to proceed with the work has been received by <br />the Contractor from the City Manager; provided however, that such notification shall be superseded <br />by any emergency work that may be required in accordance with provisions included elsewhere in <br />this solicitation and resultant contract. In addition to the written NTP, the Contractor must supply <br />the City with the required insurance and bond documents. <br /> <br />2.21 ACCIDENT PREVENTION AND BARRICADES <br />Barricades, cones, construction fencing, temporary construction fencing and off duty police officers, <br />per City regulations and other relevant requirements, shall be provided by the Contractor when <br />work is performed in areas traversed by persons, vehicular traffic or when deemed necessary by <br />the City Manager at no extra cost to the City. CONTINUOUS OFF-DUTY POLICE SUPPORT SHALL <br />BE REQUIRED FOR ALL WORK RESULTING IN MODIFICATIONS TO THE EXISTING TRAFFIC FLOW <br />PATTERNS INCLUDING BUT NOT LIMITED TO LANE CLOSURES AND DETOURS OR WHERE <br />OTHERWISE REQUESTED BY THE CITY. <br /> <br />Contractor shall comply with City, State and Federal regulations and permit requirements for the <br />placement of the proper Traffic Control Devices. Precautions shall be exercised at all times for the <br />protection of persons and property. All services performed under this contract shall conform to all <br />relevant regulations as prescribed in the current edition of the Manual of Uniform Traffic Control <br />Devices (MUTCD), the Florida Department of Transportation’s Design Standards (DS) and OSHA <br />during the course of such effort. Where requirements vary or conflict, the more stringent shall <br />apply. Any fines levied by the above mentioned authorities for failure to comply with these <br />requirements shall be borne solely by the Contractor. <br /> <br />2.22 SAFETY MEASURES: <br /> <br /> Contractor shall take all necessary precautions for the safety of employees, and shall erect <br /> and properly maintain at all times all necessary safeguards for the protection of the <br /> employees and the public. Contractor to follow all OSHA Safety Standards. Danger signs warning <br /> against hazards created by his/ her operation and work in progress must be posted. <br /> <br /> All employees of the contractor shall be expected to wear safety glasses or goggles, <br /> appropriate clothing, and hearing protection when and wherever applicable. The contractor shall <br /> use only equipment that is fully operational and in safe operating order. Contractor shall be <br /> especially careful when servicing property when pedestrians and/ or vehicles are in close proximity <br /> — work shall cease until it is safe to proceed. <br /> <br />2.23 DELIVERY & PROTECTION OF MATERIAL AND EQUIPMENT <br /> <br />All material must be F.O.B. destination. The Contractor is solely liable and responsible for the <br />purchase, delivery, and installation of all materials and equipment. The contractor will make all <br />arrangements for delivery. Contractor will be solely liable for receiving, inspecting, accepting, and <br />replacing any damaged materials or equipment and filing any and all claim with suppliers or
The URL can be used to link to this page
Your browser does not support the video tag.