<br />City of Sunny Isles Beach | RFP Bella Vista Park Dock Reconstruction 19-07-01 22 <br /> <br />Section 3 <br />Scope of Services / Technical Specifications <br /> <br />3.1 SCOPE OF WORK <br /> <br />The City of Sunny Isles Beach, FL (“OWNER”) is seeking to retain a qualified (“CONTRACTOR” or <br />“PROPOSER”) capable of providing all services associated with the removal of damaged sections <br />of original dock located at 500 Sunny Isles Boulevard. Upon contract award, the contractor will <br />reconstruct dock to original configuration pending permit approvals. New dock to consist of sleeving <br />existing pilings with PVC pipe and filling with a concrete grout, constructing joists and stringers <br />using 3" x 8" pressure treated lumber and stainless steel hardware, installing new fiberglass <br />composite mesh decking, water lines and electric lines, lights and pedestals, install float-on kayak <br />launching dock and stairs. No power or utilities are at the site. <br /> <br />The selected contractor should expect to attend meetings with City staff, engineer. Contractor <br />should also expect to present a phased approach for permitting, planning, design and <br />implementation of the proposed improvements. The selected firm will be expected to assist the <br />City in the preparation and submittal of the appropriate regulatory permitting associated with the <br />replacement of the docks. No public restrooms onsite, Contractor will need to bring a portable. <br /> <br /> The project will be carried out into two phases: <br /> <br /> Phase one: <br />Contractor shall remove and dispose of all old dock sections and miscellaneous <br />equipment. Contractor shall remove old sections of the dock and leave piling in place. <br /> <br /> Second Phase: <br />Contractor shall provide shop drawings for permitting and installation of the new dock at <br />Bella Vista Park. Contractor shall be responsible for obtaining all permits for the project. <br />Piling shall be cleaned and sleeved with 16” schedule 40 PVC pipe sections, 20’ long driven <br />into the bottom 3’. PVC to be filled with 5000 PSI cement grout. Pilings shall have whit e <br />PVC top cones. Dock substructure shall be 3” x 8” pressure treated lumber connected with <br />5/8” stainless steel bolts and hardware. Dock deck shall be Dura Grating- mini mesh <br />manufactured by Dura Composites Ltd., 22 mm thickness, tan color. Floating dock shall be <br />manufactured by AccuDock, model KD12x16 for kayak launching and include a walkway <br />for access. Pedestal services shall be EATON lighthouse power pedestal, 30A/30A, <br />30A/30A, 20A service with water hookups. <br /> <br />3.2 REQUIREMENTS OF THE CONTRACTOR <br /> <br />Contractors interested in performing these services must exhibit considerable relevant experience <br />with this type of work, and should emphasize both experience and capability of particular personnel <br />who will actually perform the work. Contractors should demonstrate that they have experience <br />working with docks reconstruction, preferably for government. The selected contractor will be <br />responsible for obtaining all Federal, State and local permits and / or approvals from Miami-Dade <br />Water and Sewer, DERM, Environmental, Miami-Dade Public Works, the Florida Department of <br />Transportation (FDOT) as necessary and all City of City of Sunny Isles Beach Building permits <br />necessary for the construction of the projects. Contractor must have at least (5) years of dock