My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFP 19-07-01 Bella Vista Park Dock Reconstruction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 19-07-01 Bella Vista Park Dock Reconstruction
>
RFP 19-07-01 Bella Vista Park Dock Reconstruction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 2:06:47 PM
Creation date
7/2/2019 2:05:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />City of Sunny Isles Beach | RFP Bella Vista Park Dock Reconstruction 19-07-01 23 <br /> <br />construction experience over the past 10 years of similar size, nature and complexity as requested <br />within this RFP, with a construction amount exceeding $50,000 and provide evidence of same <br />using the Project Verification Form provided herein. <br /> <br />3.3 CITY ENGINEER <br /> <br />All communications and correspondence shall be directed to the City Engineer and appointed <br />project manager. <br /> <br />3.4 DESIGNATED PERSONNEL <br /> <br />The Contractor shall designate the personnel according to the organization chart submitted along <br />with proposal, indicating who will be assigned specifically to the performance of this work. At the <br />time of negotiation for entry into a formal contract, the City shall have the right to specify those <br />key project personnel for whom the successful firm assigns to the project. Contractor shall not be <br />allowed to substitute other personnel without prior written permission of the City Manager. <br /> <br />3.5 STORAGE <br /> <br />A. The Contractor shall be responsible for providing satisfactory storage facilities which are <br />acceptable to the Engineer. <br /> <br />B. The Contractor shall be responsible for the maintenance and protection of all equipment, <br />materials, and products placed in storage and shall bear all costs of storage, preparation for <br />transportation, transportation, rehandling, and preparation for installation. <br /> <br />C. Unless otherwise permitted in writing by the Engineer, building products and materials such as <br />cement, grout, plaster, gypsum-board, particleboard, resilient flooring, acoustical tile, paneling, <br />finish lumber, insulation, wiring, etc., shall be stored indoors in a dry location. Building products <br />such as rough lumber, plywood, concrete block, and structural tile may be stored outdoors under <br />a properly secured waterproof covering. <br /> <br />D. Tarps and other coverings shall be supported above the stored equipment or materials on <br />wooden strips to provide ventilation under the cover and minimize condensation. Tarps and covers <br />shall be arranged to prevent ponding of water. <br /> <br />3.6 DISCREPANCIES FROM PLANS <br /> <br />If the Contractor, in the course of work, finds any discrepancy between the drawings and the <br />physical conditions of the locality, or any errors or omissions in drawings or in layout as given by <br />points and instructions, it shall be his duty to immediately inform the Engineer, in writing, and the <br />Engineer shall promptly verify the same. Any work done after such discovery, until authorized, shall <br />be done at the Contractor's risk. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.