My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFP 19-07-01 Bella Vista Park Dock Reconstruction
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFP
>
RFP No. 19-07-01 Bella Vista Park Dock Reconstruction
>
RFP 19-07-01 Bella Vista Park Dock Reconstruction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2019 2:06:47 PM
Creation date
7/2/2019 2:05:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />City of Sunny Isles Beach | RFP Bella Vista Park Dock Reconstruction 19-07-01 24 <br /> <br />3.7 AS-BUILT RECORDS <br /> <br />A complete set of as-built records shall be kept by the Contractor at the job site. These records <br />shall show all items of construction and equipment which differ in size, shape or location from <br />those shown on the Contract drawings, also any additional work, existing features or utilities <br />revealed by construction work which are not shown on the Contract drawings. These records shall <br />be kept up to date daily. They may be kept on a marked set of Contract drawings to be furnished <br />the Contractor for this purpose, or in any other form which is approved prior to the beginning of <br />the work. They shall be available at all times during construction for reference by the Engineer, <br />and shall be delivered to the Engineer prior to pre-final inspection. <br /> <br />3.8 ON-SITE WORK HOURS <br /> <br />Except as provided herein, no person or entity shall operate construction tools and equipment <br />except between the following hours: <br /> <br />A. Standard time: 7:00 a.m. to 5:00 p.m. Monday through Friday <br /> <br />B. Prohibited acts: No construction activities shall take place on Sunday and on the following <br />holidays: New Year's Day, Fourth of July, Labor Day, Yom Kippur, Thanksgiving Day, and Christmas <br />Day. As it is the City's desire to expedite this project to the extent possible, the City will permit <br />extended work hours in most cases following a written request by the Contractor. <br /> <br />3.9 CLEAN-UP <br /> <br />All unusable materials and debris shall be removed from the premises at the end of each workday, <br />and disposed of in an appropriate manner. No equipment, material, debris, trailers or other items <br />may be stored in any location outside of the provided construction easements without written <br />approval from the City and the property owner. Upon final completion, the Contractor shall <br />thoroughly clean up all areas where work has been involved as mutually agreed with the City. <br />Damage to Public and/or Private Property: Extreme care shall be taken by Contractor to safeguard <br />all existing facilities, site amenities, utilities, irrigation systems on or around the job site. Damage <br />to public and/or private property shall be the responsibility of the Contractor and shall be repaired <br />and/or replaced by Contractor at no additional cost to the City. The Contractor shall use all means <br />to protect existing objects, structures and vegetation designated to remain. In the event of <br />damage, the Contractor shall immediately make all repairs, replacements and dressings to <br />damaged materials, to the approval of the City, at no additional cost to the City. <br /> <br />END OF SECTION <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.