Laserfiche WebLink
April 24,2019 <br /> rage 8 of 9 <br /> F. Permit fees are subject to change.Allowance shall be adjusted when estimated permit fees <br /> vary. <br /> G. Site plan permitting service is not included <br /> H. Construction Engineering and Inspection Services are not included. <br /> I. Provide Survey/Design/Permitting Services for an additional drainage well into the system. <br /> Schedule Milestones: <br /> The below milestones are from Notice to Proceed (NTP) and based on 8 months of design and <br /> permitting: <br /> Calendar <br /> Milestone days from <br /> NTP <br /> Surveying&Testing 60 <br /> 30%submittal 90 <br /> 60%submittal 150 <br /> Permitting(1''submittal) 160 <br /> 90%plans 180 <br /> 100%plans and permits 200 <br /> Bid plans and specifications 240 <br /> Professional Fees: <br /> The table below gives the budget breakdown by task for the subject professional services. Please <br /> contact me if you need any additional information. <br />