My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2019-2960
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2019
>
Reso 2019-2960
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2019 10:45:14 AM
Creation date
7/29/2019 3:21:22 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2019-2960
Date (mm/dd/yyyy)
07/18/2019
Description
Apprv Agmnt w/CGA for Consult Engineering Svcs for Golden Shores Pump Station Rehabilitation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 24,2019 <br /> rage 8 of 9 <br /> F. Permit fees are subject to change.Allowance shall be adjusted when estimated permit fees <br /> vary. <br /> G. Site plan permitting service is not included <br /> H. Construction Engineering and Inspection Services are not included. <br /> I. Provide Survey/Design/Permitting Services for an additional drainage well into the system. <br /> Schedule Milestones: <br /> The below milestones are from Notice to Proceed (NTP) and based on 8 months of design and <br /> permitting: <br /> Calendar <br /> Milestone days from <br /> NTP <br /> Surveying&Testing 60 <br /> 30%submittal 90 <br /> 60%submittal 150 <br /> Permitting(1''submittal) 160 <br /> 90%plans 180 <br /> 100%plans and permits 200 <br /> Bid plans and specifications 240 <br /> Professional Fees: <br /> The table below gives the budget breakdown by task for the subject professional services. Please <br /> contact me if you need any additional information. <br />
The URL can be used to link to this page
Your browser does not support the video tag.