My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2019-2964
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2019
>
Reso 2019-2964
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2019 12:24:06 PM
Creation date
7/29/2019 3:29:12 PM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2019-2964
Date (mm/dd/yyyy)
07/18/2019
Description
Approv Agmt w/Craven Thompson for Engineer Consult Svcs for Golden Shores Utility Undergrounding
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 18,2019 <br /> CitySunny of Isles Beach <br /> Attn: Ms.Genesis Cuevas <br /> 18070 Collins Avenue <br /> Sunny Isles Beach, Florida 33160 <br /> RE: AGREEMENT FOR PROFESSIONAL SERVICES <br /> GOLDEN SHORES, UTILITY UNDERGROUNDING PROJECT <br /> SUNNY ISLES BEACH,FLORIDA <br /> CTA PROPOSAL NO.2018-UO3.383(REVISED) <br /> Dear Ms.Cuevas: <br /> The firm of Craven Thompson & Associates, Inc. (CTA) is pleased to provide you <br /> CRRIEN 1HOA IPSON with the following proposal for professional Civil Engineering, Survey, and <br /> C_ Construction <br /> Phase services for the undergrounding of utilities within the <br /> Golden Shores Neighborhood. <br /> This project involves survey, project coordination, construction documents, and <br /> construction observation services for undergrounding of overhead utility <br /> services for approximately 225 homes(refer to Exhibit 'A'). <br /> &ASSOCIATES INC. A typical approach towards undergrounding of utilities can be broken into three <br /> -Engineers - phases, 1) Assessment, 2) Design and Permitting, and 3) Bidding/Construction. <br /> Planners The CITY anticipates funding to be established through their CIP; therefore, <br /> Surveyors <br /> Landscape Architects funding mechanisms, such as special assessment, are not addressed within this <br /> proposal. For the purpose of clarification, a summary of the undergrounding <br /> process is described as follows: <br /> Phase 1-Assessment: <br /> The purpose of Phase 1 is to establish the parameters for the project including <br /> preliminary schedule, critical timelines, existing conditions, coordination with <br /> utilities, facilitate FP&L design process, and identifying issues with potential <br /> impact to the project. <br /> With the information collected with this first phase, a base-file is created <br /> depicting existing conditions for use in proposed design. Information in the <br /> form of atlases, right-of-way maps, survey, plat, and as-builts is collected and <br /> analyzed for sufficiency. If necessary, additional information is obtained <br /> through more intense means. <br /> 3563 N.W.53rd Street <br /> Fort Lauderdale,FL 33309-6311 <br /> (954)739-6400 • <br /> Fax(954)739-6409 <br />
The URL can be used to link to this page
Your browser does not support the video tag.