Laserfiche WebLink
1 <br /> Ms.Genesis Cuevas <br /> CTA Proposal No. 2018-UO3.383 (Revised) <br /> July 18, 2019 <br /> Page 2 <br /> Phase 2—Design and Permitting: <br /> In Phase 2 proposed plans are produced. The information collected in Phase 1 will be verified and used <br /> for the proposed design. FP&L and other utility providers will prepare designs for their individual <br /> systems. The CTA will coordinate the individual designs into a cohesive set of plans with detailed <br /> installation requirements. In addition to plans,this phase includes coordination with various permitting <br /> agencies. <br /> At the conclusion of this phase, all design issues and requirements should be identified, construction <br /> documents, coordinating and addressing utility concerns are prepared, easement requirements are <br /> acknowledged for procurement, and approvals from appropriate permit agencies obtained. In addition, <br /> the project has been circulated among stakeholders and an estimated cost of improvements provided. <br /> Phase 3—Bidding&Construction: <br /> Phase 3 involves Construction Phase services. It includes preparation of bid documents, facilitating and <br /> making recommendation for award, CEI services, close-out and certifications. Periodic inspections are <br /> expected and will be supported with project management to avoid problems with transfer and delivery. <br /> After construction of underground infrastructure is complete, the transfer of overhead utilities to the <br /> underground infrastructure and switchover of individual services will commence. These services are <br /> not included in this proposal as they have yet to be defined. <br /> Our scope of services is as follows: <br /> SCOPE OF SERVICES <br /> I. Phase 1-Project Assessment <br /> 1.1.a. Boundary&Topographic Survey of Pipeline Route(CTA Task No. 11050) <br /> Prepare a boundary & topographic survey of portions of the following multiple <br /> roadways and swales within the Golden Shores Neighborhood in the City of Sunny Isles <br /> Beach, Florida. The project limits are delineated on the attached Exhibit'A'. The survey <br /> will include locations within the full right-of-way of the roads listed below and all <br /> aboveground improvements. The total project length, including all streets listed covers <br /> approximately 14,000 lineal feet. <br /> 1. North Bay Road <br /> 2. Atlantic Blvd. <br /> 3. 185th Street <br /> 4. 186th Street <br /> 5. 187th Street <br /> 6. 188th Street <br /> 7. 189th Street <br /> 8. 189th Terrace <br /> 9. 190th Street <br /> 10. 191st Street <br /> 11. 191st Terrace <br /> CRAVEN 1HOMPSON&ASSOCIATES INC. <br />