Laserfiche WebLink
ENVIRO <br />WASTE SERVICES GROUP <br />Ll Owner: Orange County, FL <br />Project Title: Stormwater System Inspection, Cleaning, Sealing, Void Detection & <br />Void Filling (Y8-1034, Y8-1110, Y9-1022, Y11-112, Y12-1060, Y13-1083, Y14-1075, <br />Y14-1025, Y17-100) <br />Budget: $ 3,000,000 per year <br />Time period: June 2008 — Current, 9 separate contracts <br />Scope: EWSG has been contracted to provide various drainage related contracting <br />services for Orange County, FL, including cleaning, video inspection, chemical <br />grouting, internal joint seals, sonar inspection, ground penetrating radar, soil <br />stabilization, injection holes, and injection & sealing of cracks. EWSG has pumped more <br />than 30,000 Cubic Feet of grout for soil stabilization, cleaned and inspected over <br />2,000,000 Lf of 12-96" storm sewer, and grouted thousands, of joints. <br />Contact: Bill Blackham 407-836-6805 William,Blackham@ocfl.net <br />Owner: City of Ocala <br />Project Title: Sanitary Sewer System Inspection, Cleaning <br />Budget: $ 1,250,000 <br />Time period: 2008 — 2016 <br />Scope: EWSG has been contracted to provide cleaning and inspection of sanitary <br />sewer as well as smoke testing. 750,000 LF of sewer were smoke tested. <br />Contact: Edwards Earnest Ph: 352-629-8521 Fax: 352-629-8242 <br />Eearnest@ocalafl.org <br />C Project Name: City of Miami Beach, FL <br />Project Title: Smoke Testing <br />Budget: $ 350,000 <br />Time period: July 2010 — July 2012 <br />Synopsis: Smoke testing of 700,000+ feet of sanitary sewer along with related report <br />submittal. <br />Contact: Eric Carpenter 305-673-7080 EricCarpenter@miamibeachfl.gov <br />L Project name: S-782 Lateral Sewer Testing — 2005-2007 <br />Location: Miami -Dade Water & Sewer Department <br />Budget: $ 3,300,000 (completed at $ 2,450,000) <br />Time period: 2 years <br />Synopsis: EWSG was contracted to test approximately 6,000 sanitary sewer service <br />lateral connections in 40 lift stations throughout Miami -Dade County. The lines <br />were tested using the pressure test and/or the smoke test method. This pilot study <br />program, the first of its kind in the U.S., was requested to determine the 1&I <br />problems with the lateral connections throughout the County. <br />Contact: Miguel Pichardo 786-258-2573 Miguel. Pichardo@miamidade.gov <br />D Project name: S-793 Sanitary Sewer Service Laterals CIPP Rehabilitation <br />Location: Miami -Dade Water & Sewer Department <br />Headquarters: 18001 Old Cutler Road, #554, Miami, FL 33157 * (877) 637-9665 * F (877) 637-9659 <br />Offices: Miami, FL * Orlando, FL Tampa, FL <br />www.EWSG.com * email: infoa@ewsg.com <br />