|
ENVIRO
<br />WASTE SERVICES GROUP
<br />Ll Owner: Orange County, FL
<br />Project Title: Stormwater System Inspection, Cleaning, Sealing, Void Detection &
<br />Void Filling (Y8-1034, Y8-1110, Y9-1022, Y11-112, Y12-1060, Y13-1083, Y14-1075,
<br />Y14-1025, Y17-100)
<br />Budget: $ 3,000,000 per year
<br />Time period: June 2008 — Current, 9 separate contracts
<br />Scope: EWSG has been contracted to provide various drainage related contracting
<br />services for Orange County, FL, including cleaning, video inspection, chemical
<br />grouting, internal joint seals, sonar inspection, ground penetrating radar, soil
<br />stabilization, injection holes, and injection & sealing of cracks. EWSG has pumped more
<br />than 30,000 Cubic Feet of grout for soil stabilization, cleaned and inspected over
<br />2,000,000 Lf of 12-96" storm sewer, and grouted thousands, of joints.
<br />Contact: Bill Blackham 407-836-6805 William,Blackham@ocfl.net
<br />Owner: City of Ocala
<br />Project Title: Sanitary Sewer System Inspection, Cleaning
<br />Budget: $ 1,250,000
<br />Time period: 2008 — 2016
<br />Scope: EWSG has been contracted to provide cleaning and inspection of sanitary
<br />sewer as well as smoke testing. 750,000 LF of sewer were smoke tested.
<br />Contact: Edwards Earnest Ph: 352-629-8521 Fax: 352-629-8242
<br />Eearnest@ocalafl.org
<br />C Project Name: City of Miami Beach, FL
<br />Project Title: Smoke Testing
<br />Budget: $ 350,000
<br />Time period: July 2010 — July 2012
<br />Synopsis: Smoke testing of 700,000+ feet of sanitary sewer along with related report
<br />submittal.
<br />Contact: Eric Carpenter 305-673-7080 EricCarpenter@miamibeachfl.gov
<br />L Project name: S-782 Lateral Sewer Testing — 2005-2007
<br />Location: Miami -Dade Water & Sewer Department
<br />Budget: $ 3,300,000 (completed at $ 2,450,000)
<br />Time period: 2 years
<br />Synopsis: EWSG was contracted to test approximately 6,000 sanitary sewer service
<br />lateral connections in 40 lift stations throughout Miami -Dade County. The lines
<br />were tested using the pressure test and/or the smoke test method. This pilot study
<br />program, the first of its kind in the U.S., was requested to determine the 1&I
<br />problems with the lateral connections throughout the County.
<br />Contact: Miguel Pichardo 786-258-2573 Miguel. Pichardo@miamidade.gov
<br />D Project name: S-793 Sanitary Sewer Service Laterals CIPP Rehabilitation
<br />Location: Miami -Dade Water & Sewer Department
<br />Headquarters: 18001 Old Cutler Road, #554, Miami, FL 33157 * (877) 637-9665 * F (877) 637-9659
<br />Offices: Miami, FL * Orlando, FL Tampa, FL
<br />www.EWSG.com * email: infoa@ewsg.com
<br />
|