My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
envirowaste services group inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-08-01) Stormwater Management System Preventative Maintenance
>
Responses
>
envirowaste services group inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2019 4:25:05 PM
Creation date
9/16/2019 4:23:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E N V I R* <br />WASTE SERVICES GROUP <br />Budget: $ 500,000 <br />Time period: 2006 <br />Synopsis: EWSG was contracted by the Prime Contractor to line 95 sanitary sewer <br />service laterals throughout areas of Miami -Dade County. <br />Contact: Miguel Pichardo 786-258-2573 Miguel. Pichardo@miamidade.gov <br />❑ Project name: S-803 Sectional Line Repair — 2006/2009 <br />Location: Miami -Dade Water & Sewer Department <br />Budget: $ 2,000,000 <br />Time period: Scheduled to complete project within half the allotted time frame. <br />Synopsis: EWSG was contracted to clean, CCTV video, and inspect sewer lines <br />throughout Miami -Dade County to determine where a repair is required. The <br />specific repair method used under this contract is sectional lining. Over 2,000 <br />sectionals were installed. <br />Contact: Miguel Pichardo 786-258-2573 Miguel.Pichardo@miamidade.gov <br />Project name: S-847 Sectional Line Repair — 2010-2014 <br />Location: Miami -Dade Water & Sewer Department <br />Budget: $ 2,000,000 <br />Time period: Scheduled to complete project within half the allotted time frame. <br />Synopsis: EWSG was contracted to clean, CCTV video, and inspect sewer lines <br />throughout Miami -Dade County to determine where a repair is required. The <br />specific repair method used under this contract is sectional lining. Over 2,000 <br />sectionals were installed. <br />Contact: Miguel Pichardo 786-258-2573 Miguel. Pichardo@miamidade.gov <br />F1 Project Name: FDOT — Lake County <br />Project Title: Maintenance contract E5J21 <br />Budget: $ 630,000 (completed on time and under budget) <br />Time period: August 2007 — March 2008 <br />Synopsis: EWSG was contracted by the FDOT to repair and maintain the storm <br />water system on any of the Department's rights-of-way in Lake County. The <br />primary work duties included CIPP repair of drainage pipes, joint repairs, sealing <br />of drainage pipes and structures, pressure grouting, desilting of pipes, inlets, and <br />culverts, production of video records and written reports. The installation of liners <br />included sizes ranging from 15" to 36". <br />C Project Name: Indian Creek Village <br />Project Title: Rehabilitation of Storm Sewer System <br />Budget: $ 330,000 <br />Time period: July 2006 — March 2007 <br />Synopsis: EWSG was contracted by the Village to provide various storm sewer <br />services. The scope of services includes CIPP lining, grouting, sectional lining, <br />storm drain cleaning, video inspection, point repairs, repair of inlets and manholes, <br />and site restoration. The installation of liners included sizes ranging from 8" to 36". <br />Headquarters: 18001 Old Cutler Road, #554, Miami, FL 33157 (877) 637-9665 * F (877) 637-9659 <br />Offices: Miami, FL * Orlando, FL * Tampa, FL <br />www.EWSG.com email: info@ewsg.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.