My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
envirowaste services group inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-08-01) Stormwater Management System Preventative Maintenance
>
Responses
>
envirowaste services group inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2019 4:25:05 PM
Creation date
9/16/2019 4:23:17 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Contractor: Envirowaste <br />Contract: E5U38 <br />Evaluation Date: Jan 7, 2019 <br />Cateaory Five <br />375-026-43 <br />MA NTENANCE <br />06114 <br />Interaction, coordination, and cooperation with Department personnel, traveling public, other <br />performance <br />contractors, property owners and other Governmental agencies <br />Performance <br />Interaction with Department personnel was outstanding; no complaints from the traveling public or <br />Excellent <br />adjacent property owners were noted. The Contractor handled any issues that arose, notifying the <br />O <br />Department of the outcome. Positive feedback from the public was noted. Expectations were often <br />Satisfactory <br />exceeded. <br />O <br />Few, if any, complaints from the traveling public or adjacent property owners were noted. When a <br />Satisfactory <br />concern was expressed, the Contractor was quick to resolve it. Positive interaction with Department <br />O <br />personnel with some positive feedback from the public was noted. Expectations were always met and <br />occasionaliv exceeded. <br />Contractor failed to adequately report DBE commitmentslpayments. Requests for the Contractor to <br />Poor <br />Some complaints from outside parties and Department personnel were noted (mostly minor in nature). <br />Unsatisfactory <br />Q <br />Most complaints were handled in a timely manner. Expectations were not consistently met. <br />Numerous complaints were received about work operations, staging of equipment, and/or poor attitude. <br />Poor <br />Q <br />The Contractor repeatedly failed to follow instructions; communication and cooperation was inadequate. <br />Q <br />Notes & Comments <br />The Contractor and Team maintained apositive relationship with the Department, its representatives, and the public. The <br />Contractor consistently went above and beyond during the life of the contract to ensure all parties impacted or involved <br />with the project had their needs met. <br />category Six <br />Disadvantaged Business Enterprise (DBE) Reporting <br />Performance <br />Contractor's staff was very well qualified and capable to address sufficient utilization of the Equal <br />Opportunity Compliance System application to collect, review, and report any DBE <br />Excellent <br />(EOC) <br />commitments/payments. Periodic checks of the EOC System by Department personnel revealed no <br />issues and no follow up with the Contractor in regard to DBE issues was required. <br />0 <br />Contractor's staff sufficiently utilized the Equal Opportunity Compliance (EOC) System to adequately <br />collect, review and report DBE commitments/payments. eriodic checks of the EOC System by <br />Satisfactory <br />Department personnel revealed very few issues and minimal follow up with the Contractor m regard to <br />O <br />DBE issues was required. <br />Contractor demonstrated little interest in utilizing the EOC system to collect, review, and report any <br />Unsatisfactory <br />DBE commitments/payments. Requests for the Contractor to utilize the system were repeatedly made <br />by Department personnel and follow up with the Contractor was often required. <br />Contractor failed to adequately report DBE commitmentslpayments. Requests for the Contractor to <br />Poor <br />correct errors within the system were repeatedly made by the Department; excessive/recurring <br />assistance to the Contractor was necessary. <br />NIA <br />N/A (To be used when the Contractor is exempt from DBE reporting requirements.) <br />Q <br />Notes & Comments <br />The Contractor used the EOC system during this period. <br />
The URL can be used to link to this page
Your browser does not support the video tag.