My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ITB 19-08-01 Stormwater Management System Preventative Maintenance
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
ITB
>
(19-08-01) Stormwater Management System Preventative Maintenance
>
ITB 19-08-01 Stormwater Management System Preventative Maintenance
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2019 4:26:56 PM
Creation date
9/16/2019 4:26:11 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />CITY OF SUNNY ISLES BEACH |INVITATION TO BID NO. 19-08-01 20 <br /> <br />inspections, field review and becoming familiar with any and all site <br />conditions that might otherwise hinder the Proposer’s ability to perform said <br />services and include all necessary accommodations and resolution as part of <br />the proposal. <br /> <br /> The Proposer shall be solely responsible for ensuring that all MOT <br />requirements are met and permits maintained for the duration of work. All <br />associated costs shall be deemed incidental to the project. <br /> <br /> The Proposer shall be responsible for water supply <br /> <br />3.9 PROJECT IDENTIFICATION <br /> <br />No signs or advertisement will be allowed to be displayed at the work site. <br /> <br /> <br /> <br />END OF SECTION <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.