Laserfiche WebLink
<br />CITY OF SUNNY ISLES BEACH |INVITATION TO BID NO. 19-08-01 19 <br /> <br /> All asphalt pads around catch basins shall be free of any and all vegetation. <br /> <br /> All vegetation growth into and surrounding the basins shall be removed. <br /> <br /> Proposer shall dispose of materials removed from stormwater systems in <br />accordance with applicable Federal, State, County and City rules and policies. <br /> <br /> All water jetting must be conducted to the extent that it will allow for clear <br />flow of water throughout the storm lines. <br /> <br /> Cost shall include any and all disposal fees. <br /> <br />3.8.2 Facility Inspection <br /> Proposer shall provide all labor, equipment and materials required to perform <br />condition assessments on existing City storm drain infrastructure, including <br />but not limited to structures, pipes and injection wells, utilizing video <br />inspection or other assessment method as recommended by Proposer <br />(subject to City approval). <br /> <br /> Proposer shall organize findings into a report to the City with a prioritized list <br />of infrastructure in need of repair; and Proposer recommendations for repair <br />or rehabilitation. <br /> <br />3.8.3 NPDES MS4 Compliance <br /> Proposer shall assist the City in meeting applicable permitting requirements <br />and deadlines, implementing tasks and recommendations and maintaining <br />compliance in accordance with National Pollutant Discharge Eliminations <br />System (NPDES) Municipal Separate Storm Sewer System (MS4) applications <br />and permits. <br /> <br /> Proposer shall be responsible for supplying information for City to complete <br />Annual NPDES MS4 Reports during the term of their Contract. <br /> <br />3.8.4 General Requirements <br /> Proposer shall comply with all applicable Federal, State, County and City <br />regulations. <br /> <br /> The successful Proposer will be required to meet with and communicate <br />regularly with City staff to keep them informed of progress and any problems <br />encountered. <br /> <br /> The Proposer will be required to prepare monthly reports, as requested by <br />the City for the duration of work. <br /> <br /> Structure dimensions vary, as does the distance between the structures. <br />Prior to submission of the Proposal, Bidder is responsible for field