City of Sunny Isles Beach | RFP Bella Vista Park Dock Reconstruction 19-10-01 22 <br />Section 3 <br />Scope of Services / Technical Specifications <br />3.1 SCOPE OF WORK <br />The City of Sunny Isles Beach, FL (“OWNER”) is seeking to retain a qualified “CONTRACTOR” <br />capable of providing all services associated with the removal of damaged sections of the original <br />dock located at 500 Sunny Isles Boulevard. Upon contract award, the contractor will reconstruct <br />dock to original configuration. New dock to consist of reusing existing pilings, constructing joists <br />and stringers using 2" x 6" pressure treated lumber and stainless steel hardware, 2" x 6" pressure <br />treated lumber decking, water lines and electric lines, lights and pedestals to service 6 slips, <br />install float-on kayak launching dock and stairs. The work covered by these specifications includes <br />the furnishing of all materials; labor, equipment, personnel and performing all operations in <br />connection with the services as specified herein and shown on the bid documents, along with <br />attached exhibits and drawings. Dock will be used for boat dockage and a kayak/canoe rental as <br />part of the refurbished park once completed in about 2 years. No power or utilities are at the site. <br />The selected contractor should expect to attend meetings with City staff, engineer. Contractor <br />should also expect to present a phased approach for permitting, planning, design and <br />implementation of the proposed improvements. The selected firm will be expected to assist the <br />City in the preparation and submittal of the appropriate regulatory permitting associated with the <br />replacement of the docks. No public restrooms onsite, Contractor will need to bring a portable. <br /> The project will be carried out into two phases: <br />Phase one: <br />Contractor shall remove and dispose of all old dock sections and miscellaneous <br />equipment. Contractor shall remove old sections of the dock and leave piling in place. <br />Second Phase: <br />Contractor shall provide shop drawings for permitting and installation of the new dock at <br />Bella Vista Park. Piling shall be cleaned and reused. Dock substructure shall be 2” x 6” <br />pressure treated lumber connected with 5/8” stainless steel bolts and hardware. Floating <br />dock shall be manufactured by AccuDock, model KD12x16 for kayak launching and include <br />a walkway for access. Pedestal services shall be EATON lighthouse power pedestal, <br />30A/30A, 30A/30A, 20A service with water hookups. <br />3.2 REQUIREMENTS OF THE CONTRACTOR <br />Contractors interested in performing these services must exhibit considerable relevant experience <br />with this type of work, and should emphasize both experience and capability of particular personnel <br />who will actually perform the work. Contractors should demonstrate that they have experience <br />working with docks reconstruction, preferably for government. Contractor will be responsible for <br />assisting with final DERM permit application to be submitted. Contractor must have at least (5) <br />years of dock construction experience over the past 10 years of similar size, nature