Laserfiche WebLink
r R.J.Behar & Company, Inc. <br />'a En g ineers • Planner s <br />1.6 Utility Conflicts Special Design <br />This task will include developing special conflict details to identify conflict <br />resolution method between sewer line and other existing utilities. <br />1.7 Utility Coordination <br />The Consultant will contact all utility owners in the project vicinity to <br />ascertain the location of their utilities (if any). This information will be <br />included in the plans to be utilized to identify potential conflicts. <br />1.8 General Notes Sheet <br />This plan sheet will include all City required notes as well as specific <br />instructions to the Contractor. <br />1.9 Sewer Connection Upgrades <br />This task includes a plan view and vertical and horizontal controls for <br />construction of the sewer line upgrade. <br />1.10 Lift Station Design <br />This task includes the selection of the required pump size and selecting a <br />suitable location within the site. <br />1.11 Lift Station Plan <br />This task includes vertical and horizontal controls on plan view, sufficient to <br />construct the structure to contain the selected pump and connection to sewer <br />line. <br />1.12 Exterior Site Lighting Design <br />This task includes an analysis of existing lighting and photometric <br />calculations. <br />1.13 Exterior Site Lighting Plan <br />The Consultant will prepare a plan sheet showing the location and power <br />connections to proposed site lighting improvements. <br />1.14 Structural Design <br />Structural design calculations, as may be needed, to construct the exterior <br />shower wall extension. <br />1.15 Structural Details <br />Plan details as may be needed for structural components of the exterior wall. <br />1.16 Specifications <br />The technical specifications for the project will be prepared and formatted to <br />comply with the City's front end documents. <br />1.17 Cost estimates <br />The Consultant will develop an estimate of probable construction costs for <br />the proposed design. A spreadsheet will be developed summarizing the <br />results and identifying estimated quantities and anticipated unit prices. <br />1.18 Contract Management <br />This entails coordinating and managing the subconsultants and ensuring their <br />compliance with project schedule and budget. <br />Work Order Proposal Samson Oceanfront Park Services <br />City of Sunny Isles Beach Page 2 of 6 <br />