My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2229
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2229
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 2:46:40 PM
Creation date
4/25/2014 9:59:17 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2229
Date (mm/dd/yyyy)
04/17/2014
Description
Agmt w/RJ Behar & Co. for Engineering & Arch. Srvs at Samson Oceanfront Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, .,4 ,:.. <br />R.J.Behar & Company, Inc. <br />Engineers • Planner s <br />1.19 Coordination Meeting (with City Staff) <br />The Consultant will attend (up to four) coordination meeting with the City's <br />Staff. <br />1.20 Permitting <br />The Consultant will establish contact with FDOT District 6, Miami -Dade <br />County, and City of Sunny Isles Beach to determine their requirements and <br />conditions for project approval and procure all necessary permits. This does <br />not include permit fees. <br />1.21 Workshop Support <br />The Consultant will provide technical support during the workshop and <br />presentation to commission, including a PowerPoint presentation and 2 <br />Exhibit Boards. <br />1.22 Bid and Award Support <br />RJ Behar will furnish the Contract Documents to the City for bidding, attend <br />a prebid conference, address any inquiries from bidders, issue addenda as <br />required and assist in the evaluation of bids. <br />III. SURVEY SERVICES: <br />Our survey subconsultant will perform a Boundary /Topographic Survey to include the <br />following information; <br />1. Longitude will locate all walkways, sidewalks, buildings, light poles, and all other <br />significant above - ground features within the survey corridor. <br />2. Longitude will establish the City of Sunny Isles Beach Bulkhead Line and the <br />Erosion Control Line. <br />3. Longitude will collect elevations in an approximate 50 -foot grid throughout the <br />survey limits. <br />4. All elevations shall be based on the North American Vertical Datum 1988 <br />(NAVD88), unless the client prefers a different datum. <br />IV. ARCHITECTURAL SERVICES: <br />1. Initial site visit to meet with the City officials, gather site information and pick up the <br />existing paper working drawings. <br />2. Incorporate the existing drawing information into the CADD files to aid in the design <br />of the project. <br />3. Composed Schematic Design (SD) of the new bathroom additions of W/C and the <br />new showers on the new wall to be used for presentation to the City for their <br />approval, <br />4. Develop the SD into the final working, (permit) drawings that will be submitted for <br />approval to the building department. <br />5. Assist the City in the preparation of any changes needed to issue the drawings for <br />construction the bid documents. <br />Work Order Proposal Samson Oceanfront Park Services <br />City of Sunny Isles Beach Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.