My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 2014-2229
SIBFL
>
City Clerk
>
Resolutions
>
Regular
>
2014
>
Reso 2014-2229
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/8/2015 2:46:40 PM
Creation date
4/25/2014 9:59:17 AM
Metadata
Fields
Template:
CityClerk-Resolutions
Resolution Type
Resolution
Resolution Number
2014-2229
Date (mm/dd/yyyy)
04/17/2014
Description
Agmt w/RJ Behar & Co. for Engineering & Arch. Srvs at Samson Oceanfront Park
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R.J.Behar & Company, Inc. <br />E n g i n e e r s • P l a n n e r s <br />3. Site survey with information as required in 6213- 33.0081 FAC, <br />4. Lighting plans, <br />5. Site plans, <br />6. Grading plans, <br />7. Cross sections, <br />8. Drainage calculations, <br />9. Construction schedule, and <br />10. Planting plans. <br />E Sciences will submit the application package and coordinate with the FDEP and FWC. <br />This scope includes one response to Requests for Additional Information (RAI). Responses <br />to the RAIs within this scope are limited to clarification of information previously <br />submitted. Should one of the agencies request additional information or studies that were <br />beyond the scope of this proposal (e.g. a nighttime light survey or design modifications that <br />affect the permit), we will inform you that a modification in our scope and price may be <br />required. <br />The scope will include one site meeting with agency staff to review site conditions and <br />proposed improvements. We will attempt to meet with both agencies during the meeting. If <br />multiple inspections are necessary, this will be beyond the scope of services. <br />VII. LANDSCAPE ARCHITECTURAL <br />This task establishes an allowance to be invoiced hourly as needed to attend meetings <br />with City staff and assist in the development of a "Tree Survey ". <br />VIII. GEOTECHNICAL SERVICES: <br />This task establishes an allowance to be used as needed in support of structural design. <br />IX. COMPENSATION: <br />Work Order Proposal Samson Oceanfront Park Services <br />City of Sunny Isles Beach Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.