Laserfiche WebLink
R.J.Behar & Company, Inc. <br />E n g i n e e r s • P l a n n e r s <br />3. Site survey with information as required in 6213- 33.0081 FAC, <br />4. Lighting plans, <br />5. Site plans, <br />6. Grading plans, <br />7. Cross sections, <br />8. Drainage calculations, <br />9. Construction schedule, and <br />10. Planting plans. <br />E Sciences will submit the application package and coordinate with the FDEP and FWC. <br />This scope includes one response to Requests for Additional Information (RAI). Responses <br />to the RAIs within this scope are limited to clarification of information previously <br />submitted. Should one of the agencies request additional information or studies that were <br />beyond the scope of this proposal (e.g. a nighttime light survey or design modifications that <br />affect the permit), we will inform you that a modification in our scope and price may be <br />required. <br />The scope will include one site meeting with agency staff to review site conditions and <br />proposed improvements. We will attempt to meet with both agencies during the meeting. If <br />multiple inspections are necessary, this will be beyond the scope of services. <br />VII. LANDSCAPE ARCHITECTURAL <br />This task establishes an allowance to be invoiced hourly as needed to attend meetings <br />with City staff and assist in the development of a "Tree Survey ". <br />VIII. GEOTECHNICAL SERVICES: <br />This task establishes an allowance to be used as needed in support of structural design. <br />IX. COMPENSATION: <br />Work Order Proposal Samson Oceanfront Park Services <br />City of Sunny Isles Beach Page 5 of 6 <br />