savings due to scale of operation. <br /> • 0. <br /> b. Easement negotiations with several properties along Collins Ave. <br /> delayed the installation.of .FPL,equipment necessary. for the utility <br /> • <br /> undergrounding process resulting in additional cost for out of sequence <br /> activities. . <br /> • <br /> c. Underground unforeseen obstructions were encountered at the Ritz <br /> Carlton Residences project which further impacted the installation of <br /> conduit for the utility conversion in Phase 1 of the project. <br /> d. Change Order 14 included the• undergrounding of utilities along the <br /> Atlantic corridor but failed to include the additional survey and as-built <br /> documents required by FPL for the,ultimate installation ofconductor. <br /> e. The above noted impacts require a contracttime extension:.and <br /> related additional costs for General Conditions, Maintenance of Traffic, <br /> Bond and Insurance. The original contract unit "rice for these items has <br /> P <br /> been reduced, on a monthly basis, due to reduction of resources <br /> requires!. . <br /> FUNDING SOURCE: . <br /> 300-5-5390-465000-80004 • • <br /> ATTACHMENTS: S O <br /> Description <br /> Resolution <br /> Change Order No.24 <br /> Change Order No.25 . . <br /> Item Number: 10.F. <br /> • <br /> • <br /> 0 <br /> 186 <br />