Laserfiche WebLink
City of Sunny Isles Beach 18070 Collins Avenue, Sunny Isles Beach, Florida 33160 <br /> (305) 947-0606 phone (305) 949-3113 Fax <br /> RELATING TO THIS CONTRACT, CONTACT THE CITY'S <br /> CUSTODIAN OF PUBLIC RECORDS AT (305) 792-1703, <br /> CityClerk@sibfl.net, 18070 Collins Avenue, 4th Floor, Sunny Isles Beach, <br /> Florida 33160. <br /> 20. WARRANTY OF CONSTRUCTION <br /> 20.1 The Contractor shall warrant the labor performed for a minimum period of one (1) <br /> year from the date the Services are complete. This warranty shall be in addition to <br /> whatever rights the City may have under state or federal law. The Contractor's <br /> obligation under this warranty shall be at its own cost and expense, to <br /> promptly repair or replace (including cost of removal and installation), that <br /> item (or part or component thereof) which proves defective or fails to comply with <br /> the Agreement within the warranty period such that it complies with the <br /> Agreement. <br /> 20.2 Contractor warrants to the City that all materials and equipment furnished under <br /> this Agreement will be new unless otherwise specified and will be of good <br /> quality, free from faults and defects and in conformance with the Agreement. All <br /> equipment and materials not conforming to these requirements, including <br /> substitutions not properly approved and authorized, may be considered defective. <br /> If required by City or its designee, Contractor shall furnish satisfactory evidence as <br /> to the kind and quality of materials and equipment. Manufacturer materials shall be <br /> warranted for a minimum period of ten (10) years from the date Services are <br /> complete. This warranty is not limited by any other provisions within this <br /> Agreement. <br /> 20.3 Contractor shall provide to the City or its designee all manufacturers' warranties. <br /> All warranties, expressed and/or implied, shall be given to the City for all material <br /> and equipment covered by this Agreement. All material and equipment furnished <br /> shall be fully guaranteed by the Contractor against factory defects and <br /> workmanship. At no expense to the City, the Contractor shall correct any and all <br /> apparent and latent defects that are required under state or federal law. <br /> 21. DEFECTIVE WORK <br /> 21.1 The City or its designee shall have the authority to reject or disapprove work <br /> which is found to be defective. If defective work is found, Contractor shall <br /> promptly either correct all defective work or remove such defective work and <br /> replace it with non-defective work. Contractor shall bear all direct and indirect <br /> costs of such removal or corrections including cost of testing laboratories and <br /> personnel. <br /> 2019-7291 G.Concrete Development,Inc. <br /> 9 <br />