Laserfiche WebLink
RFQ No. 19-11-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. - CCNA. <br />City of Sunny Isles Beach <br />|60 <br />QUALIFICATION INFORMATION & ASSIGNED PERSONNEL <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THE CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS PROJECT 14. YEARS EXPERIENCE <br />TAMMY COOK-WEEDON, ASLA, <br />PLA, LEED AP BD+C Landscape Architect <br />a. TOTAL b. WITH CURRENT FIRM <br />32 22 <br />15. FIRM NAME AND LOCATION (City and State) <br />Calvin, Giordano & Associates, Inc. - Fort Lauderdale, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />B.S. Landscape Architecture, Texas A&M University College <br />Staion, 1987 <br />REGISTERED PROFESSIONAL LANDSCAPE <br />ARCHITECT, FLORIDA NO. 0001328 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Member: Ms. Cook-Weedon leads the Landscape Architectural staff, has over 30 years of landscape architectural experience with <br />demonstrated strengths in creative design, graphic presentations, and planting design. She has successfully completed numerous <br />large-scale projects, which encompassed design studies, planting designs, natural area development and the various inter-related <br />professions and tasks necessary to manage the projects through to completion. <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Mills Pond Park: Soccer/Lacrosse Fields,Fort Lauderdale, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2014 Ongoing <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Developed a plan to build 3 new synthetic turf soccer and lacrosse fields at Mills Pond Park, including coordinating surveying, civil engineering, electrical <br />engineering, site planning, landscape architecture, and all of the sub-consultants on the project. The design of the new fields will include drainage, lighting, and <br />irrigation as well as associated parking, walkways, and landscape improvements. Construction cost is estimated at $3.3 million, with completion scheduled <br />for December, 2016. CGA’s fees: $379,000.fic. <br />b. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Soccer Field Conversion at Weston Regional Park <br />Weston, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2016 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Ms. Cook-Weedon managed staff of the landscape architecture department to convert four of the City’s existing grass soccer fields to synthetic turf fields. <br />These conversions will be the first of two park field conversions in the City. The selected synthetic turf options uses an organic infill material rather than <br />the standard black rubber material. Early test results indicated players raving about the playing surface. Services included civil engineering as well. Cost: <br />$350,000.00 <br />c. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Vista Park, Weston, FL <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2008 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />CGA developed the master plan for Vista Park. With four soccer fields and four baseball fields, this park is well utilized by Weston residents as well as the high <br />school. Special detailing of the edges of the fields were designed to address the clay and sod areas by creating header curbs to separate those areas. The <br />design, construction documents and construction administration was provided by CGA. Cost: $5.5 Million. <br />d. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Delray Beach Fire Rescue Headquarters Plaza <br />Delray Beach, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2015 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Senior Landscape Architect. Designing and permitting improvements to pedestrian at the SE corner of the Fire Rescues Headquarters Building for the City of <br />Delray Beach and the CRA. Project includes on the creation of a pedestrian plaza which will feature public art. Ms. Cook-Weedon provided assistant during the <br />project construction. She addressed shop drawing reviews, RFI’s and provided frequent site visits to address issues with the contractor . Cost: $800,000.00r <br />groups. <br />e. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />Deering Estate at Old Cutler Palmetto Bay, Florida <br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable) <br />2003 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE  Check if project performed with current firm <br />Historical restoration and landscape design to repair the damaged areas of the estate following Hurricane Andrews devastation of the property, including <br />detailed archeological planting design, habitat restoration and planting design for a new visitors’ facility. Cost: $2.8 million <br />E