|
RFQ No. 19-11-01 Professional Engineering and Architectural Services for Pedestrian Bridge with Park Elements Across A1A at 174th St. - CCNA.
<br />City of Sunny Isles Beach
<br />|60
<br />QUALIFICATION INFORMATION & ASSIGNED PERSONNEL
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THE CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS PROJECT 14. YEARS EXPERIENCE
<br />TAMMY COOK-WEEDON, ASLA,
<br />PLA, LEED AP BD+C Landscape Architect
<br />a. TOTAL b. WITH CURRENT FIRM
<br />32 22
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Calvin, Giordano & Associates, Inc. - Fort Lauderdale, FL
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />B.S. Landscape Architecture, Texas A&M University College
<br />Staion, 1987
<br />REGISTERED PROFESSIONAL LANDSCAPE
<br />ARCHITECT, FLORIDA NO. 0001328
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Member: Ms. Cook-Weedon leads the Landscape Architectural staff, has over 30 years of landscape architectural experience with
<br />demonstrated strengths in creative design, graphic presentations, and planting design. She has successfully completed numerous
<br />large-scale projects, which encompassed design studies, planting designs, natural area development and the various inter-related
<br />professions and tasks necessary to manage the projects through to completion.
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Mills Pond Park: Soccer/Lacrosse Fields,Fort Lauderdale, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2014 Ongoing
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Developed a plan to build 3 new synthetic turf soccer and lacrosse fields at Mills Pond Park, including coordinating surveying, civil engineering, electrical
<br />engineering, site planning, landscape architecture, and all of the sub-consultants on the project. The design of the new fields will include drainage, lighting, and
<br />irrigation as well as associated parking, walkways, and landscape improvements. Construction cost is estimated at $3.3 million, with completion scheduled
<br />for December, 2016. CGA’s fees: $379,000.fic.
<br />b.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Soccer Field Conversion at Weston Regional Park
<br />Weston, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2016 N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Ms. Cook-Weedon managed staff of the landscape architecture department to convert four of the City’s existing grass soccer fields to synthetic turf fields.
<br />These conversions will be the first of two park field conversions in the City. The selected synthetic turf options uses an organic infill material rather than
<br />the standard black rubber material. Early test results indicated players raving about the playing surface. Services included civil engineering as well. Cost:
<br />$350,000.00
<br />c.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Vista Park, Weston, FL
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2008 N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />CGA developed the master plan for Vista Park. With four soccer fields and four baseball fields, this park is well utilized by Weston residents as well as the high
<br />school. Special detailing of the edges of the fields were designed to address the clay and sod areas by creating header curbs to separate those areas. The
<br />design, construction documents and construction administration was provided by CGA. Cost: $5.5 Million.
<br />d.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Delray Beach Fire Rescue Headquarters Plaza
<br />Delray Beach, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2015 N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Senior Landscape Architect. Designing and permitting improvements to pedestrian at the SE corner of the Fire Rescues Headquarters Building for the City of
<br />Delray Beach and the CRA. Project includes on the creation of a pedestrian plaza which will feature public art. Ms. Cook-Weedon provided assistant during the
<br />project construction. She addressed shop drawing reviews, RFI’s and provided frequent site visits to address issues with the contractor . Cost: $800,000.00r
<br />groups.
<br />e.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />Deering Estate at Old Cutler Palmetto Bay, Florida
<br />PROFESSIONAL SERVICES CONSTRUCTION (if applicable)
<br />2003 N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Historical restoration and landscape design to repair the damaged areas of the estate following Hurricane Andrews devastation of the property, including
<br />detailed archeological planting design, habitat restoration and planting design for a new visitors’ facility. Cost: $2.8 million
<br />E
|