My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Perkins
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(19-11-01) Prof Eng and Arch Srvcs Ped Bridge REVISED
>
Responses
>
Perkins
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 3:19:50 PM
Creation date
1/14/2020 3:18:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRMPat Bosch Design Principal 33 23 <br />15. FIRM NAME AND LOCATION (City and State) <br />Perkins and Will | Coral Gables, Florida <br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Master of Architecture, Columbia University <br />Technology Diploma, ETH/Swiss Federal Institute of Technol- <br />ogy <br />LEED® AP <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />International Women’s Forum; Women’s Chamber of Commerce; Mayor’s Green Commission <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)City Sunny Isles Beach Pedestrian Bridge | Sunny Isles Beach, Florida Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />The pedestrian bridge design for Sunny Isles Beach at Government Center takes its inspiration from the geometric patterning of <br />the medjool date palm trunks that line the streetscape of Collins Avenue from north to south. The structure of the bridge will be <br />steel frame repeating sections that clear span Collins Avenue; that structural frame is encased in a light-weight concrete skin on <br />both sides. Role: Design Principal <br />b. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Suny Isles Government Center Annex | Sunny Isles, Florida 2015 - Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />The Annex Project, located immediately to the north of the Government Center, extends the Civic Plaza and develops a mixed- <br />use program including Educational, Office, Community Auditorium, Retail and Civic Expansion spaces with structured parking in <br />both below-grade and above grade locations. Size: 113,000 sf; Cost of Construction: N/A; Role: Design Principal <br />c. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)American Express Sunrise Corporate Center | Sunrise, Florida 2011 2015 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />The American Express Sunrise Corporate Center is a 443,000 square foot office building on a 40.8 acre parcel located in <br />Sunrise, Florida. The office building is planned to be 5 stories with a two story parking garage located adjacent to the building. <br />Additionally, a stabilized grassed and landscaped area to the east of the parking structure will provide for any potential overflow <br />parking. Size: 360,000 sf; Cost: N/A; Role: Design Principal <br />d. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Miami Beach City Hall Annex | Miami Beach, Florida 2007-2009 2009 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />The structure accommodates a 7-level parking garage with a capacity of 654 parking spaces and a 5-story office component <br />with 38,500 SF of gross floor area. A decorative screening envelops the parking structure, while the office component fronting <br />Meridian Avenue features a glazed curtain wall. The scope of the project included the creation of a pedestrian plaza and pocket <br />park in the south edge of the project, as well as the enhancement of the Meridian Avenue streetscape between 17th and 19th <br />streets. Size: 300,000 sf; Cost: $23.5 million; Role: Design Principal <br />e. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Confidential Energy Services Provider Headquarters <br />Palm Beach Gardens, Florida 2018 Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />The project vision was defined in large part by the desire to push the limits of Sustainability and Resiliency. This goal originated <br />from an imperative to support business continuity during extreme weather events. At the workplace levels the building <br />maximizes daylight, which results in enhance performance and healthy environments. Size: 250,000 sf; Cost of Construction: <br />N/A; Role: Design Principal
The URL can be used to link to this page
Your browser does not support the video tag.