|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE
<br />a. TOTAL b. WITH CURRENT FIRMChristopher Counts Landscape Architecture Principal 19 1
<br />15. FIRM NAME AND LOCATION (City and State)
<br />Perkins and Will | Coral Gables, Florida
<br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />Master of Landscape Architecture, Harvard University
<br />Bachelor of Landscape Architecture, University of Georgia
<br />ALSA, FAAR
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />American Society of Landscape Architects, Fellow of the American Academy in Rome, Executive Board Member of NYASLA
<br />19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Confidential Energy Services Provider Headquarters
<br />Palm Beach Gardens, Florida 2018 Ongoing
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm
<br />The project vision was defined in large part by the desire to push the limits of Sustainability and Resiliency. This goal originated
<br />from an imperative to support business continuity during extreme weather events. At the workplace levels the building
<br />maximizes daylight, which results in enhance performance and healthy environments. Size: 250,000 sf; Cost of Construction:
<br />N/A; Role: Landscape Architecture Designer
<br />b.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Novartis Corporate Campus
<br />East Hanover, New Jersey 2007 2008
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />A new Master Plan vision for the 300-acre campus incorporates and interconnects historic buildings and spaces of the corporate
<br />campus. The strategy for the new North American headquarters establishes connection between buildings, social spaces, and
<br />ecologically rich nodes. Ultimately, the Master Plan improves site performance as an environmentally responsible, aesthetically
<br />pleasing, and socially stimulating campus. Size: 300 acres; Cost of Construction: N/A; Role: Landscape Architecture Designer
<br />c.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Lower Don Lands
<br />Toronto, Ontario 2006 2007
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br /> The Lower Don Lands park vision for Toronto’s waterfront becomes an iconic catalyst for future urban parks. Within each neigh-
<br />borhood, the design creates multiple opportunities for planned and spontaneous social interaction between broad tree-lined
<br />sidewalks, cafés, squares, and the play fields tucked throughout the park. Size: 300 acres; Cost of Construction: N/A; Role:
<br />Landscape Architecture Designer
<br />d.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Moore Square
<br />Raleigh, North Carolina 2010 2011
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Moore Square, a four-acre, 220-year-old public space, is one of five original Squares established by William Christmas’ 1792
<br />plan for the Capital of North Carolina and is listed on the National Register of Historic Places. The Master Plan design honors
<br />the Square’s historic heritage while establishing a forward-looking vision for a 21st century urban space, enhancing the park
<br />and improving the quality of life for residents. Size: 4 acres; Cost of Construction: $12 Million; Role: Landscape Architecture
<br />Designer
<br />e.
<br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Cornell University, Bailey Plaza
<br />Itaca, New York 2006 2007
<br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />Located at the crossroads of Cornell’s campus and in front of Bailey Hall, its most distinguished event venue, the plaza elegantly
<br />expresses the sites unique social, intellectual, and geological identity through an elemental mosaic of stone, water, wood, and
<br />plants. Size: 1 acre; Cost of Construction: N/A; Role: Landscape Architecture Designer
|