Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRMLeo Alvarez Urban Design Principal 39 12 <br />15. FIRM NAME AND LOCATION (City and State) <br />Perkins and Will | Coral Gables, Florida <br />16. EDUCATION (Degree and Specialization)17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Master of Landscape Architecture, Harvard University Gradu- <br />ate School of Design; <br />Bachelor of Science, Architectural Technology, Florida Inter- <br />national University <br />Landscape Architect: Florida, Georgia, Pennsylvania, Virginia, Texas, <br />Arkansas, Maryland, South Carolina, North Carolina, Kentucky <br />CLARB Certified; LEED® Accredited Professional; American Soci- <br />ety of Landscape Architects, Fellow; American Institute of Architects <br />(AIA) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />n/a <br />19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Atlanta Beltline | Atlanta, Georgia 2010 2030 (Anticipated) <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />The Atlanta BeltLine is an infrastructure framework of old railroads is being transformed into a 22-mile transit greenway that <br />combines light-rail transit, parks and multi-use trails to generate economic growth and protect quality-of-life in 45 historic <br />neighborhoods. The BeltLine Corridor Design will establish typologies for all landscape architecture elements, wayfinding and <br />signage, infrastructure and development interface. Size: 22 miles Cost: $11M Specific Role: Design Principal <br />b. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Innovation Square, University of Florida | Gainesville, Florida 2012 2014 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />Perkins and Will led the development for a long term vision plan for the redevelopment of the former Alachua County General <br />Hospital and surrounding commercial properties into a mixed-use urban research district located between the University of <br />Florida and downtown Gainesville. The vision for Innovation Square is a sustainable district that fits within an integrated urban <br />fabric and creates a rich environment that fosters forward-looking, innovative and interdisciplinary research and discovery. Size: <br />60+ acres; Cost: $2M Specific Role: Principal Landscape Architect <br />c. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Miami Beach City Hall Annex | Miami Beach, Florida 2007-2009 2012 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />The structure accommodates a 7-level parking garage with a capacity of 654 parking spaces and a 5-story office component <br />with 38,500 SF of gross floor area. A decorative screening envelops the parking structure, while the office component fronting <br />Meridian Avenue features a glazed curtain wall. The scope of the project included the creation of a pedestrian plaza and pocket <br />park in the south edge of the project, as well as the enhancement of the Meridian Avenue streetscape between 17th and 19th <br />streets. Size: 300,000 sf; Cost: $23.5 million; Role: Design Principal <br />d. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Ludlam Trail Corridor Master Plan | Miami, Florida Ongoing Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />The former railway corridor will be converted into a publicly accessible pedestrian and bicycle trail. This will boost mobility in the <br />area, provide opportunities for physical activity, and improve the economic vitality of the neighborhood. Size: 6 miles; Cost: n/a; <br />Role: Design Principal <br />e. <br />(1) TITLE AND LOCATION (City and State)(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)Overtown Cultural & Entertainment District | Miami, Florida 2018 Ongoing <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE X Check if project performed with current firm <br />The Overtown Cultural and Entertainment District will be distinct from much of the new development in downtown Miami. It will <br />be highly walkable, scaled for pedestrians, with centralized parking and access to public transportation. Size: 40 acres; Cost: <br />n/a; Role: Design Principal