|
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />12. NAME
<br />15. FIRM NAME AND LOCATION (CITY & STATE)
<br />(1) TITLE AND LOCATION (CITY & STATE)
<br />(1) TITLE AND LOCATION (CITY & STATE)
<br />(1) TITLE AND LOCATION (CITY & STATE)
<br />(1) TITLE AND LOCATION (CITY & STATE)
<br />(1) TITLE AND LOCATION (CITY & STATE)
<br />PROFESSIONAL SERVICES
<br />PROFESSIONAL SERVICES
<br />PROFESSIONAL SERVICES
<br />PROFESSIONAL SERVICES
<br />PROFESSIONAL SERVICES
<br />CONSTRUCTION (IF APPLICABLE)
<br />CONSTRUCTION (IF APPLICABLE)
<br />CONSTRUCTION (IF APPLICABLE)
<br />CONSTRUCTION (IF APPLICABLE)
<br />CONSTRUCTION (IF APPLICABLE)
<br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE (BRIEF SCOPE, SIZE, COST, ETC.)
<br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE (BRIEF SCOPE, SIZE, COST, ETC.)
<br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE (BRIEF SCOPE, SIZE, COST, ETC.)
<br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE (BRIEF SCOPE, SIZE, COST, ETC.)
<br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE (BRIEF SCOPE, SIZE, COST, ETC.)
<br />16. EDUCATION (DEGREE & SPECIALIZATION)
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC)
<br />19. RELEVANT PROJECTS
<br />(2) YEAR COMPLETED
<br />(2) YEAR COMPLETED
<br />(2) YEAR COMPLETED
<br />(2) YEAR COMPLETED
<br />(2) YEAR COMPLETED
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE)
<br />13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />A. TOTAL B. CURRENT FIRM
<br />STANDARD FORM 330 (REV. 8/2016) PAGE 6
<br />b.
<br />d.
<br />e.
<br />a.
<br />c.
<br />CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />CHECK IF PROJECT PERFORMED WITH CURRENT FIRM
<br />M.S., Engineering, 2009, Manhattan College, Riverdale, NY
<br />B.S., Engineering, 1999, University of Michigan, Ann Arbor, MI
<br />Licensed Professional Engineer in Florida and New York
<br />Thornton Tomasetti - Miami, FL
<br />Brad Malmsten, P.E.Principal-in-Charge 21 19
<br />Brad Malmsten has more than 15 years of experience in the design and delivery of concrete and steel structural systems. He joined
<br />Thornton Tomasetti’s New York office in 2001 and moved to the Fort Lauderdale office in 2010. Brad’s background includes domestic and
<br />international tall and supertall mixed-use towers, transformative renovations, long-span structures, hospitals, educational and municipal
<br />facilities. He leads the firm’s Structural Engineering practice in Florida.
<br />X
<br />X
<br />X
<br />X
<br />X
<br />Precast concrete detailing services for the design approach of a pedestrian bridge addition to a building. Principal in Charge.
<br />Structural design of two sail-shaped towers connected by a 448-meter elevator mast and spire via pedestrian bridges at three levels.
<br />The towers, at 93 and 64 stories accommodate Class-A office space, hotels and apartments. The complex is linked to a central core
<br />with a shopping mall, entertainment facilities and a transportation center. The project was the first in Russia to make use of super high-
<br />strength concrete technology. Scope also included curtain wall consulting and specialty glass and steel design. Project Manager.
<br />As part of a new hospital design, structural design services were provided for a 35 foot steel pedestrian bridge connector to the main
<br />hospital. Principal in Charge.
<br />Engineer-of-Record for the structural design of a pedestrian bridge and the five-story building. The 73,500-square-foot municipal office
<br />building will house chamber of commerce meeting rooms and city officials administration offices. The four-story, precast concrete
<br />parking garage will accommodate 600 cars. Connecting the two structures is a seventy-foot long structural steel truss pedestrian
<br />bridge. Cost: $38M. Principal in Charge.
<br />Structural engineering for a pedestrian bridge spanning approximately 120 feet across Collins Avenue and providing access between
<br />the Sunny Isles Beach Government Center and the Atlantic Ocean. With a total length of approximately 200 feet, the bridge is
<br />supported on cantilevered arms extending from elevator cores on each side of Collins Avenue. Principal in Charge
<br />2014 2014
<br />2017 2017
<br />2016 2016
<br />2017 2017
<br />On Going On Going
<br />6th Avenue Pedestrian Bridge, Golden, CO
<br />Moscow International Business Center, Federation Tower, Lot 13,
<br />Moscow, RUS
<br />City of Coral Springs, Pedestrian Bridge and Municipal Complex,
<br />Coral Springs, FL
<br />Ghana Ridge Hospital Pedestrian Bridge Connector, Accra, GHA.
<br />City of Sunny Isles Beach Government Center and Pedestrian Bridge,
<br />Sunny Isles Beach, FL
|