Laserfiche WebLink
E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />12. NAME <br />15. FIRM NAME AND LOCATION (CITY & STATE) <br />(1) TITLE AND LOCATION (CITY & STATE) <br />(1) TITLE AND LOCATION (CITY & STATE) <br />(1) TITLE AND LOCATION (CITY & STATE) <br />(1) TITLE AND LOCATION (CITY & STATE) <br />(1) TITLE AND LOCATION (CITY & STATE) <br />PROFESSIONAL SERVICES <br />PROFESSIONAL SERVICES <br />PROFESSIONAL SERVICES <br />PROFESSIONAL SERVICES <br />PROFESSIONAL SERVICES <br />CONSTRUCTION (IF APPLICABLE) <br />CONSTRUCTION (IF APPLICABLE) <br />CONSTRUCTION (IF APPLICABLE) <br />CONSTRUCTION (IF APPLICABLE) <br />CONSTRUCTION (IF APPLICABLE) <br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE (BRIEF SCOPE, SIZE, COST, ETC.) <br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE (BRIEF SCOPE, SIZE, COST, ETC.) <br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE (BRIEF SCOPE, SIZE, COST, ETC.) <br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE (BRIEF SCOPE, SIZE, COST, ETC.) <br />(3) BRIEF DESCRIPTION AND SPECIFIC ROLE (BRIEF SCOPE, SIZE, COST, ETC.) <br />16. EDUCATION (DEGREE & SPECIALIZATION) <br />18. OTHER PROFESSIONAL QUALIFICATIONS (PUBLICATIONS, ORGANIZATIONS, TRAINING, AWARDS, ETC) <br />19. RELEVANT PROJECTS <br />(2) YEAR COMPLETED <br />(2) YEAR COMPLETED <br />(2) YEAR COMPLETED <br />(2) YEAR COMPLETED <br />(2) YEAR COMPLETED <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE & DISCIPLINE) <br />13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />A. TOTAL B. CURRENT FIRM <br />STANDARD FORM 330 (REV. 8/2016) PAGE 6 <br />b. <br />d. <br />e. <br />a. <br />c. <br />CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />CHECK IF PROJECT PERFORMED WITH CURRENT FIRM <br />M.E.S.E., Manhattan College, Riverdale, NY, 1981 <br />B.E.S.E., Manhattan College, Riverdale, NY, 1980 <br />Licensed Professional Engineer in Florida, New Jersey and New <br />York <br />Thornton Tomasetti - New York, NY <br />Samuel L. Summerville, P.E. Bridge Structural Engineering 39 22 <br />Sam has more than three decades of experience in the transportation field. His work includes bridge inspections, new bridge design, and <br />the rehabilitation of large-scale, complex structures, urban interchanges and highway structures across North America. His work on New <br />York City’s Manhattan Bridge spans a period of 25 years and includes five major rehabilitation contracts. Sam Summerville oversees the <br />firm’s Transportation practice. <br />X <br />X <br />X <br />X <br />X <br />Design of a new pedestrian bridge connecting Park Row to the existing Police Plaza Overpass to provide pedestrian access from <br />Chatham Square to the Civic Center Region. The proposed pedestrian bridge is a cast-in-place concrete cantilever structure, which <br />is designed to blend into the overall landscaping revitalization of Chatham Square. Cost: $8M. Project Manager. <br />Engineering services for final design. This project included redecking of the following: five Brooklyn and two Manhattan steel approach <br />structures with total length of 1,627 feet; 3,357 feet of ramp structures; and 1,300 feet of approach roadway supported on brick arches. <br />The design encompasses the rehabilitation of the substructure for the approaches and ramp, lighting, striping, drainage, and <br />maintenance and protection of traffic. Cost: $508M. Quality Control Manager. <br />Structural repairs on the approach and main spans of the Manhattan Bridge. Includes removal and replacement <br />of select ornamental cast iron fixtures on the bridge towers, including the tower globes. Other major rehabilitation includes repairs to <br />lower gusset plates of main trusses, rehabilitation of the south upper roadway expansion joints, repairs to relief joints and replacement <br />of the ornamental fascia railing along the south pedestrian walkway. Cost: $90M. Project Manager. <br />Structural design services for the rehabilitation of the lower level along both approaches to the Verrazano-Narrows Bridge and the Lily <br />Pond Avenue Bridge. The work included the removal and replacement of elevated approach decks in Staten Island and Brooklyn and <br />the removal and replacement of the Lily Pond Avenue Bridge deck, substructure repair, seismic evaluation and retrofit, strengthening of <br />bridges to carry an HS-25 live load, and construction support services. Cost: $100M. Project Manager. <br />Structural engineering for a pedestrian bridge spanning approximately 120 feet across Collins Avenue and providing access between <br />the Sunny Isles Beach Government Center and the Atlantic Ocean. With a total length of approximately 200 feet, the bridge is <br />supported on cantilevered arms extending from elevator cores on each side of Collins Avenue. Engineer of Record. <br />On Going On Going <br />2015 2015 <br />On Going On Going <br />2010 2010 <br />On Going On Going <br />Park Row Pedestrian Bridge, New York, NY <br />Brooklyn Bridge Approaches/Ramps Rehabilitation (Contract 6), <br />New York, NY <br />Verrazano-Narrows Bridge - Rehabilitation of Lower Level <br />(VN-17) and the Lily Pond Avenue Bridge, Staten Island, NY <br />Manhattan Bridge Component Rehabilitation (Contract #15), <br />New York, NY <br />City of Sunny Isles Beach Government Center and Pedestrian Bridge, <br />Sunny Isles Beach, FL