Laserfiche WebLink
19. RELEVANT PROJECTS <br />a. <br />(1) TITLE AND LOCATION (City and State) SR A1A/Collins Avenue Improvements YEARS COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION <br />NA <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager for design and plans preparation for the milling, resurfacing, restoration and rehabilitation of State Road A1A (Collins Avenue) <br />between 5th and 15th Street in the City of Miami Beach. . <br /> <br />b. <br />(1) TITLE AND LOCATION (City and State) Tamiami Canal Historic Swing Bridge PD&E Study - FDOT D6 YEARS COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION <br />NA <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager responsible for an Environmental Assessment (EA) PD&E study to consider the rehabilitation/replacement of a 1921 historic, <br />two-lane, Bob-Tailed swing bridge over the Tamiami Canal and roadway reconstruction along the NW South River Drive/Delaware Parkway <br />corridor. Project requirements include the collection of field traffic and travel data and the preparation of traffic, access management, <br />engineering reports and environmental documents; a Section 4(f) document; and preliminary plans for this heavily urbanized arterial that <br />services major business and residential communities. Improvements include a new higher, double-leaf Bascule Bridge; intersection <br />reconstructions; and access management modifications. Extensive public involvement efforts are being done as part of this study. <br />c. <br />(1) TITLE AND LOCATION (City and State) Meridian Avenue over Collins Canal - FDOT D6 YEARS COMPLETED <br />PROFESSIONAL SERVICES <br /> <br />CONSTRUCTION <br />2014 - 2019 <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Project Manager for the bridge replacement design services for the Meridian Avenue Bridge over Collins Canal. Improvements included: <br />roadway, drainage, signalization, lighting and maintenance of traffic. Specifically, the project included the following: (1) Replacement of the <br />bridge over Collins Canal; (2) Reconstruction of the south approach Meridian Avenue roadway. (3) Aesthetic/streetscape improvements which <br />included: pigmented cement pavers for the roadbed and bridge, stone pavers for the sidewalk, stone veneer for the vertical surfaces of the <br />bridge, and decorative lighting; (4) Drainage improvements which included the installation of a drainage well to dispose of the contaminated <br />water prior to discharge into the Collins Canal and (5) Signalization and non-decorative roadway lighting. <br />d. <br />(1) TITLE AND LOCATION (City and State) PD&E Study for Venetian Causeway – FDOT District 6 YEARS COMPLETED <br />PROFESSIONAL SERVICES <br />2012-Ongoing <br /> CONSTRUCTION <br />N/A <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />The project requirements include the inspection of the bridges, engineering reports, environmental documents, a Section 4(f) document and <br />preliminary plans. Project Manager and Structural Engineer responsible for conceptual Structural Analysis and design of the ten low level fixed <br />span bridges, preparation of Preliminary Engineering Report study documents, public involvement workshops and activities, and <br />coordination with sub-consultants and agencies. The Venetian Causeway bridges (ten low-level fixed spans and two movable bascules) from <br />North Bayshore Drive in Miami to Purdy Avenue in Miami Beach were originally built in 1926 and have been designated as historic landmarks by <br />the City of Miami and City of Miami Beach; they are also listed on the National Register of Historic Places (NRHP). Extensive public <br />involvement efforts are being done as part of this study. The PD&E study will look at alternatives that satisfy the public; protect the environment; <br />are sensitive to the historic designation; result in bridges that are safe, maintainable and serve the needs of the public. <br />e. <br />(1) TITLE AND LOCATION (City and State) Sunrise Blvd. (Hiatus Road to Pine Island Road) YEARS COMPLETED <br />PROFESSIONAL SERVICES <br /> <br /> CONSTRUCTION <br />N/A <br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />Principal in Charge responsible for the widening and resurfacing of this 1.5 mile segment of the existing four-lane divided Sunrise Blvd. between <br />Hiatus Road and Pine Island Road. <br /> <br /> <br />2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />12. NAME: Enrique “Rick” Crooks, PE 13. ROLE IN THIS CONTRACT: QA/QC-Bridges/Structures <br />14. YEARS EXPERIENCE <br />a. TOTAL: <br /> 33 b. WITH CURRENT FIRM: 25 <br /> <br />15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126 <br />16. EDUCATION (Degree and Specialization): <br />1991 - Master of Business Administration, Florida International University <br />1985 - Bachelor of Science in Civil Engineering, University of Florida <br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 42528 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.):