19. RELEVANT PROJECTS
<br />a.
<br />(1) TITLE AND LOCATION (City and State) SR A1A/Collins Avenue Improvements YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />
<br />CONSTRUCTION
<br />NA
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager for design and plans preparation for the milling, resurfacing, restoration and rehabilitation of State Road A1A (Collins Avenue)
<br />between 5th and 15th Street in the City of Miami Beach. .
<br />
<br />b.
<br />(1) TITLE AND LOCATION (City and State) Tamiami Canal Historic Swing Bridge PD&E Study - FDOT D6 YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />
<br />CONSTRUCTION
<br />NA
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [X] Check if project performed with current firm Project Manager responsible for an Environmental Assessment (EA) PD&E study to consider the rehabilitation/replacement of a 1921 historic,
<br />two-lane, Bob-Tailed swing bridge over the Tamiami Canal and roadway reconstruction along the NW South River Drive/Delaware Parkway
<br />corridor. Project requirements include the collection of field traffic and travel data and the preparation of traffic, access management,
<br />engineering reports and environmental documents; a Section 4(f) document; and preliminary plans for this heavily urbanized arterial that
<br />services major business and residential communities. Improvements include a new higher, double-leaf Bascule Bridge; intersection
<br />reconstructions; and access management modifications. Extensive public involvement efforts are being done as part of this study.
<br />c.
<br />(1) TITLE AND LOCATION (City and State) Meridian Avenue over Collins Canal - FDOT D6 YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />
<br />CONSTRUCTION
<br />2014 - 2019
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br />Project Manager for the bridge replacement design services for the Meridian Avenue Bridge over Collins Canal. Improvements included:
<br />roadway, drainage, signalization, lighting and maintenance of traffic. Specifically, the project included the following: (1) Replacement of the
<br />bridge over Collins Canal; (2) Reconstruction of the south approach Meridian Avenue roadway. (3) Aesthetic/streetscape improvements which
<br />included: pigmented cement pavers for the roadbed and bridge, stone pavers for the sidewalk, stone veneer for the vertical surfaces of the
<br />bridge, and decorative lighting; (4) Drainage improvements which included the installation of a drainage well to dispose of the contaminated
<br />water prior to discharge into the Collins Canal and (5) Signalization and non-decorative roadway lighting.
<br />d.
<br />(1) TITLE AND LOCATION (City and State) PD&E Study for Venetian Causeway – FDOT District 6 YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />2012-Ongoing
<br /> CONSTRUCTION
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br />The project requirements include the inspection of the bridges, engineering reports, environmental documents, a Section 4(f) document and
<br />preliminary plans. Project Manager and Structural Engineer responsible for conceptual Structural Analysis and design of the ten low level fixed
<br />span bridges, preparation of Preliminary Engineering Report study documents, public involvement workshops and activities, and
<br />coordination with sub-consultants and agencies. The Venetian Causeway bridges (ten low-level fixed spans and two movable bascules) from
<br />North Bayshore Drive in Miami to Purdy Avenue in Miami Beach were originally built in 1926 and have been designated as historic landmarks by
<br />the City of Miami and City of Miami Beach; they are also listed on the National Register of Historic Places (NRHP). Extensive public
<br />involvement efforts are being done as part of this study. The PD&E study will look at alternatives that satisfy the public; protect the environment;
<br />are sensitive to the historic designation; result in bridges that are safe, maintainable and serve the needs of the public.
<br />e.
<br />(1) TITLE AND LOCATION (City and State) Sunrise Blvd. (Hiatus Road to Pine Island Road) YEARS COMPLETED
<br />PROFESSIONAL SERVICES
<br />
<br /> CONSTRUCTION
<br />N/A
<br />(3) BRIEF DESCRIPTION (Brief Scope, Size, Cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br />Principal in Charge responsible for the widening and resurfacing of this 1.5 mile segment of the existing four-lane divided Sunrise Blvd. between
<br />Hiatus Road and Pine Island Road.
<br />
<br />
<br />2E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />12. NAME: Enrique “Rick” Crooks, PE 13. ROLE IN THIS CONTRACT: QA/QC-Bridges/Structures
<br />14. YEARS EXPERIENCE
<br />a. TOTAL:
<br /> 33 b. WITH CURRENT FIRM: 25
<br />
<br />15. FIRM NAME AND LOCATION (City and State): EAC Consulting, Inc. – 5959 Blue Lagoon Drive, Ste. 410, Miami, FL 33126
<br />16. EDUCATION (Degree and Specialization):
<br />1991 - Master of Business Administration, Florida International University
<br />1985 - Bachelor of Science in Civil Engineering, University of Florida
<br />17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) Professional Engineer: Florida – 42528
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.):
|